Bulfinch Crossing
One Congress
Lua error in Module:Location_map at line 411: attempt to index field 'wikibase' (a nil value).
Location within Boston
General information
Status Under construction
Type Office, retail
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Named for Bulfinch Triangle
Groundbreaking Summer 2019
Construction started Late 2015
Completed 2022 (est.)
Opening 2022
Height
Roof 520 ft (160 m)
Top floor 600 ft (180 m)
Technical details
Floor count 43
Floor area 1,012,000 sq ft (94,000 m2)
Design and construction
Architect César Pelli
Architecture firm Pelli Clarke Pelli
Developer HYM Investment Group
Other designers CBT Architects
Main contractor Tishman Construction
Other information
Facilities MBTA subway and bus station, Bluebikes dock, charging station, Zipcar, Maven, Enterprise Rent-A-Car
Parking 1,160 spaces
Website
bulfinchcrossing.com/buildings/one_congress
References
[1][2]
Bulfinch Crossing
The Sudbury
General information
Status Complete
Type Residential, retail
Named for Bulfinch Triangle
Groundbreaking January 24, 2017
Construction started Late 2015
Completed 2020
Opening 2020
Height
Roof 519 ft (158 m)
Technical details
Floor count 45
Floor area 547,900 sq ft (50,900 m2)
Design and construction
Architect Pelli Clarke Pelli and CBT Architects
Developer HYM Investment Group
Other designers CBT Architects
Other information
Number of rooms 423 (residential), 200 (hotel)
Facilities MBTA subway and bus station, Bluebikes dock, charging station, Zipcar, Maven, Enterprise Rent-A-Car
Parking 1,160 spaces
Website
bulfinchcrossing.com/buildings/residential_tower
References
[1][2][3]

Bulfinch Crossing (also known as the Government Center Garage Redevelopment) is a redevelopment project currently under construction in Downtown Boston, Massachusetts, United States. It will consist of two skyscrapers, a smaller residential tower, a low-rise office building, a hotel, and a low-rise retail building. Site preparation began in late 2015, and construction officially commenced on January 24, 2017. Construction on the residential tower completed in 2020.[4] The high-rise office tower, One Congress, commenced construction in 2019 and topped off in July 2021; it is planned to open in 2022.[5]

One Congress

File:Bulfinch Crossing P1040060.jpg
Towers under construction, 2022

The primary building of the development is the 43-story office tower, which will feature a three-story lobby and high-end amenities.[6] The first four floors of the building will contain the lobby and a restaurant, with each floor containing 23,200 square feet. Floors five through ten will contain offices and parking, and each floor will contain 8,800 square feet. The remaining floors will contain offices, and each floor will contain 27,500 square feet. The building is planned to earn a gold level of certification through the US Green Building Council's Leadership in Energy and Environmental Design certification program.[7]

Some preliminary construction on the building is underway, but no major construction will begin until an anchor tenant is found. As in summer of 2018, developers of One Congress & Bulfinch Crossing have announced on Bulfinch Crossing's Twitter that construction will finally start One Congress in summer of 2019 and also announced that it will be opening in 2022.[8] In January 2019, State Street Corporation was announced to be the primary tenant in the new building.[9]

The building will contain a fitness center, basketball court, rooftop garden, and several conference rooms. On-site parking is also available.[6][7]

Residential tower

The second largest building in the development is the larger residential tower (sometimes called Residential Tower I by the developer), which is planned to be at least 480 ft (150 m) tall.

The tower was originally planned to consist of 486 apartments, but will now instead contain only 368 apartments and 55 condos. This change was announced in July 2017 when the developer decided to convert 118 apartments into 55 condos due to a slowing demand for luxury housing in Boston.[3]

The residential tower will contain a fitness center, swimming pool, rooftop garden, clubroom, private kitchen and diner, yoga room, golf simulator, pet spa, concierge services and a sky lounge and terrace. On-site parking is also available.[6][10]

Other buildings

Along with the two main towers of the development, four smaller buildings and a public square will be constructed. Along with these buildings, there will be nearly 4,132,500 sq ft (383,900 m2) in the entire development.

Residential Tower II

A smaller residential tower (officially named Residential Tower II), is being constructed alongside the rest of the development. It is planned to rise at least 299 feet (91 metres) and contain 28 stories. The tower is planned to be primarily residential, with 291 units. At least 8,400 sq ft (800 m2) of the building will be designated for retail use.[6]

Boutique Office

In addition to the main office tower, a smaller office building (officially named Boutique Office) is under construction; it is planned to contain at least 163,800 sq ft (15,200 m2) of both office and retail space. The building will rise 152 feet (46 meters) and will contain 11 stories. It is planned to have a private terrace for office workers.[6]

Retail building

A retail building (officially named Iconic Retail) is planned to be constructed as part of the development project; it is planned to be situated across the street from the Boston Public Market and will contain four floors. The building is intended to house a flagship store, and will include an entrance to the Haymarket Square subway station.

Hotel

A 157 ft (48 m) tall hotel building is being constructed at the northern edge of the site, and is planned to contain at least 200 hotel rooms. Although the main use for the building is a hotel, at least 57 condominiums and 17,400 sq ft (1,600 m2) of retail space will be located inside the 14-story building.

Amenities

The hotel is planned to contain a ballroom, several meeting rooms, a rooftop bar, and a rooftop terrace.

Parking garage

File:2007 Government Center Boston 872059350.jpg
The Government Center garage will be mostly demolished, but over 1,000 spaces will remain as part of the new development.

In order to make room for the new development, the existing Government Center garage will be demolished. The garage was constructed in the 1960s as part of the Government Center urban renewal project; it contains 2,300 parking spaces. Due to the fact that the garage is entirely made out of concrete, it is considered to be an eyesore by many, along with the nearby City Hall building.[2]

At least 1,160 parking spaces in the garage are to be preserved to accommodate the new development, the spaces are planned to be placed inside of the new office tower.[6][11]

External links

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.