Expressway S69 (Poland)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Expressway S69 shield}}

Expressway S69
Droga ekspresowa S69
290px
Route information
Length: 44.8 km (27.8 mi)
53.34 km (33 mi) planned
Major junctions
From: S1-PL.svg near Bielsko-Biała
  25px in Bielsko-Biała 25px in Żywiec
To: Diaľnica D3.svg border with Slovakia(planned)
Location
Major cities: Bielsko-Biała
Highway system
National roads in Poland

Expressway S69 or express road S69 (in Polish droga ekspresowa S69) is major road in Poland which, when completed, will run from Bielsko-Biała to the border with Slovakia at Zwardoń/Skalité where it will connect with Slovakian motorway D3. From Bielsko-Biała to Żywiec the road will be dual carriageway, the remaining part to the border with Slovakia will be single carriageway only (with terrain reserves for construction of second carriageway in future).

File:Milowka s69.jpg
S69 construction near Milówka, 2005

Route description

Number of exit(facility) Name Mialeage from beginning History of construction Notes
1) Bielsko-Biała-KomorowiceS1-PL.svgDK1-PL.svg 0 km Works from here to Suchy Potok interchange were allowed in May 2009 To Suchy Potok interchange concurrency with S1-PL.svg, western terminus
2) Bielsko-Biała-Rosty 2.9 km (1.80 mi)
3) Suchy PotokS1-PL.svg(planned) 4.5 km (2.80 mi) Contract was signed in October 2008 to the Bielsko-Biała-Mikuszowice-II interchange S1-PL.svg planned have an interchange here
4) Bielsko-Biała-LipnikDK52-PL.svg 6.8 km (4.23 mi)
5) Bielsko-Biała-Mikuszowice-I 10.8 km (6.71 mi)
6) Bielsko-Biała-Mikuszowice-II40x40px 11.5 km (7.15 mi)
7) No name 14.2 km (8.82 mi) From here to Żywiec interchange: first contract signed in 2010, which was cancelled two years later, and signed with other company in July 2014. Done in July 2015.
8) No name (Rybarzowice) 17.7 km (11.00 mi)
9) No name(Kalki) 21 km (13.05 mi)
10) Żywiec40x40px 26.5 km (16.47 mi) From here to Przybędza interchange: signed in June 2005, done by November 2006
11) Browar 29.2 km (18.14 mi)
12) Przybędza 33.9 km (21.06 mi) From here to Milówka interchange: the section has got DŚU (environmental decision), tender to be soon announced
13) Milówka 42.14 km (26.18 mi)
14) Kasperka40x40px 46.84 km (29.11 mi) No exit of eastbound traffic on the road
15) Laliki 49.54 km (30.78 mi) Last interchange before border
Zwardoń40x40px40x40px 53.34 km (33.14 mi) Entrance to Slovakia
File:Wiadukt nad kameszniczanka.jpg
Viaduct over Kameszniczanka valley
File:Bielsko obwodnica 090618 6282.JPG
Construction near Bielsko-Biała, July 2009

<templatestyles src="Asbox/styles.css"></templatestyles>