Graham Farmer Freeway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Graham Farmer Freeway
Western Australia
270px
Eastern tunnel entry near Lord Street
General information
Type Freeway
Length 6.4 km (4.0 mi)
Opened 2000
Route number(s) <templatestyles src="Plainlist/styles.css"/>
Major junctions
East end <templatestyles src="Plainlist/styles.css"/>
  <templatestyles src="Plainlist/styles.css"/>
  • Loftus Street (State Route 61)
  • Lord Street (State Route 51)
  • East Parade (State Route 66)
West end <templatestyles src="Plainlist/styles.css"/>
Location(s)
Major suburbs / towns West Perth, Northbridge, East Perth, Highgate, Burswood
Highway system
Highways in Australia
National HighwayFreeways in Australia
Highways in Western Australia

Graham Farmer Freeway is a 6.4-kilometre (4.0 mi) inner-city freeway in Perth, Western Australia. It links Rivervale and Burswood with West Perth and Leederville, providing an east-west bypass of Perth's central business district.

The freeway, in conjunction with Great Eastern Highway and Orrong Road, is also an important connection between the city centre and Perth Airport. It is allocated State Route 8, and was named in honour of the Australian rules footballer, Graham "Polly" Farmer, who played between 1953 and 1971 in both the West Australian and Victorian Football Leagues.

Route description

File:Graham farmer freeway tunnel east gnangarra.webm
Driving through the Graham Farmer Freeway tunnel eastbound
File:Graham farmer freeway tunnel west gnangarra.webm
Driving through the Graham Farmer Freeway tunnel westbound

Western terminus

The freeway's western terminus is a hybrid interchange, combining a Full Y interchange with the Mitchell Freeway, an exit to James Street, and an entrance ramp from and exit ramp to Loftus Street. The interchange also incorporates a partial Y interchange that connects Charles Street to the Mitchell Freeway.

Northbridge Tunnel

Immediately east of the interchange is the Northbridge Tunnel, Western Australia's only freeway tunnel. The 1.6-kilometre (1 mi) tunnel has three traffic lanes in each direction, with an escape passageway between the carriageways. The tunnel is colloquially known as the "Polly Pipe", a reference not only to the freeway's namesake, but also to the colloquialism "Poly Pipe" in reference to plastic pipes (commonly made from polyethylene or polyvinyl chloride materials) used in reticulation and plumbing.[1] Both tunnel portals feature public art installations. At the western end, there is a pictorial history of Northbridge, and at the eastern end, the Aboriginal artist Ron Corbett created images based on indigenous artwork. The transportation of dangerous goods and explosives through the freeway tunnel is prohibited.[2]

Perth City exits

At the eastern end of the tunnel is the diamond interchange with East Parade, which connects the freeway to East Perth. The East Parade exit ramps allow traffic movements to the opposite entrance ramp, as the westbound entrance ramp also connects to Lord Street, whilst the eastbound exit ramp merges with a ramp from Lord Street. This allows a connection between the city centre and the freeway, via Lord Street.

Windan Bridge

The freeway then crosses the Swan River over the 406-metre (1,332 ft), six lane Windan Bridge,.[3][4][5] The bridge is one of the more recent constructions, out of the 19 bridges that cross the river. The bridge includes pedestrian and cycling access.[6]

Burswood

Graham Farmer Freeway continues into Burswood as a six lane freeway. There is a diamond interchange with Victoria Park Drive for access to the adjacent Belmont Park Racecourse, and the nearby Crown Perth complex. The eastern terminus is a modified diamond interchange with Great Eastern Highway, that includes a looped ramp for the south-westbound to north-eastbound traffic movement. The freeway continues south-east as Orrong Road, an arterial road that is also part of State Route 8.

History

Graham Farmer Freeway was constructed between 1996 and 2000, and used over 180,000 cubic metres of concrete. The project finished three months early and within budget, costing $313 million. It has been designed to have a 150-year lifespan, following the Main Roads Western Australia specification.

Stage 1 involved construction of the tunnel and was undertaken by a Clough/Baulderstone joint venture,[7] was a finalist for the 2001 Australian Construction Achievement Award.[8]

Stage 2 included the Windan Bridge, and nine other traffic and pedestrian bridge structures. This stage won an award from Austroads, the Association of Australian and New Zealand Road Transport and Traffic Authorities.[9]

2013 tunnel expansion

During several weekend closures in April 2013, the existing breakdown shoulders were removed to accommodate an extra lane of traffic in each direction, without modifying the tunnel's structure.[10] The removal of the breakdown lanes was criticised by the state Opposition, and the RAC raised concerns about emergency response times.[11] As part of the upgrade, Main Roads Western Australia implemented an incident response plan, including a dedicated towing service, and the fire control and ventilation systems were upgraded.[10] The new eastbound lane opened on 16 April, a day after it was originally scheduled to open, due to delays in commissioning the new lane use management system.[12][13] The third westbound lane opened on 29 April, as scheduled.[14] The works were designed to improve the traffic flow in the Perth CBD, which will be affected by construction projects such as the development of Elizabeth Quay.

Exits and interchanges

LGA Location km mi Destinations Notes
Perth, Vincent West Perth 0–
1.0
0–
0.6
Mitchell Freeway (State Route 2) – Joondalup, Perth City Full Y-Interchange
0.7 0.43 Loftus Street (State Route 61) – West Perth Eastbound entrance and westbound exit only. Ramps continue from/to local roads
Perth Northbridge 1.0 0.6 James Street – Northbridge Westbound exit only
Perth, Vincent Northbridge, Perth 1.0–
2.6
0.6–
1.6
Northbridge Tunnel
Perth 2.6 1.6 Lord Street (State Route 51) – Perth City Centre, Northbridge, Mount Lawley Eastbound entrance and westbound exit only, via East Parade ramps
East Perth 3.3 2.1 East Parade (State Route 66) – East Perth, Mount Lawley
Perth, Vincent, Victoria Park East Perth, Burswood 3.7–
4.2
2.3–
2.6
Windan Bridge (over the Swan River)
Victoria Park Burswood 4.5–
5.0
2.8–
3.1
Victoria Park Drive – Burswood
Victoria Park, Belmont Burswood, Lathlain, Rivervale 6.4 4.0 Great Eastern Highway (National Highway 94 / National Route 1) – Midland, Fremantle, Perth Airport Continues south-east as Orrong Road (State Route 8); Modified diamond interchange: additional north-westbound looped entrance ramp
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

Notes and references

Script error: No such module "Attached KML".

  1. Hyde, John; Hansard; 2002-05-08
  2. Explosay Issue Number 25 (Sept 2000) ISSN 1038 - 7099 (PDF) Retrieved 13 August 2006.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Windan Bridge. Named after the wife of Yallgunga, the head of the Mooro tribe which controlled the northern end of the Swan River in 1833. Geographic name approvals in Western Australia, Jan./Mar. 2000, p.31
  5. Minister names new bridge over Swan River, named Windan Bridge after the wife of Yallgunga, .Media statement, Minister for Transport, 9/4/2000
  6. http://www.toptrails.com.au/index.php/trails/trail/windan-bridge-loop/
  7. Graham Farmer Freeway - Perth
  8. Graham Farmer Freeway Stage One Retrieved 13 August 2006.
  9. Graham Farmer Freeway Bridges - Winner category 2 Austroads PDF. Retrieved 13 August 2006.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.