Kohala Hydropower Project

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Kohala Hydropower Project
Kohala Hydropower Project is located in Pakistan
Kohala Hydropower Project
Location of Kohala Hydropower Project in Pakistan
Official name Kohala Hydropower Project
Location Azad Kashmir, Pakistan
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Contract awarded [1]
Construction cost $2.4 Billion
Owner(s) Water and Power Development Authority (WAPDA)
Dam and spillways
Type of dam Gravity, roller-compacted concrete
Impounds Jhelum River
Height 57 m (187 ft)
Length 212 m (696 ft)
Reservoir
Total capacity 49,000,000 m3 (39,725 acre⋅ft)
Active capacity 8,730,000 m3 (7,078 acre⋅ft)
Surface area .78 km2 (0 sq mi)
Max. length 6.4 km (4 mi)
Power station
Name Kohala Hydropower Plant
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Type Run-of-the-river
Hydraulic head 290 m (950 ft)
Turbines 4 x 275 MW Francis-type[2]
Installed capacity 1100 MW
Annual generation 4800 GWh

The Kohala Hydropower Project is a proposed run-of-the-river, high head project of 316 meters, located in Muzaffarabad District, Azad Jammu & Kashmir. The dam site is just upstream of Domel on Jhelum River near Siran Village 174 km from Islamabad and powerhouse is located at Barsala 7 km upstream from Kohala Bridge.[3] The dam and powerhouse are to be connected through a tunnel. The feasibility study and detailed engineering designs were performed by SMEC.[4]

China Three Gorges Corporation

China Three Gorges Corporation (CTGC), the state-owned hydropower developer, has won the right to develop a hydropower project in Pakistan, CTGC announced on Thursday January 7, 2015. The Kohala Hydropower Project, the firm’s biggest investment in the Pakistani hydropower market as of yet. In 2014, Pakistan’s National Transmission and Dispatch Co. and China International Water and Electric Corp. (CWE) -- a subsidiary of Three Gorges Dam -- finalized a 30-year tariff at 7.9 cents per unit and estimate the project will cost about US$2.4 billion.

The Kohala hydroelectric scheme will have a gravity, roller-concrete compacted dam on the upper branch of the Jhelum, 40 km from Muzaffarabad. The powerhouse, on the lower branch of the Jhelum near Barasala, will house four 275-MW Pelton turbines. CWE is required to construct the project on a build, own, operate and transfer basis. In 2014, local published reports said the average tariff for the first 12 years was set at 8.9 cents per unit and during the following 18 years would be 5.1 cents per unit. The average tariff for the 30-year life of the project is 7.9 cents per unit. The tariff ensures 17 per cent return on equity on internal rate of return basis. The project is expected to earn carbon credit from the United Nations Framework Convention on Climate Change for clean energy development under the Kyoto protocol.

See also

References

  1. http://app.com.pk/en_/index.php?option=com_content&task=view&id=124824&Itemid=2
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.