Line 13, Shanghai Metro

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Line 13, Shanghai Metro
Line 13
十三号线
Shanghai Metro logo.svg
Platform at West Jinshajiang Rd Station
Overview
Type Rapid transit
System Shanghai Metro
Status Phase I western section operational,
the rest under construction
Locale Shanghai, China
Termini Jinyun Road
Shibo Avenue
Stations 19
Daily ridership 340,000 (2015 peak)[1]
Operation
Opened December 30, 2012 (Phase I western section), December 28, 2014 (rest of Phase I western section), December 19, 2015 extended to Shibo Avenue
Operator(s) Shanghai No. 2 Metro Operation Co., Ltd.
Character Underground
Technical
Line length 22.2 km (13.79 mi)
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead lines (1500 volts)
Operating speed 80 km (49.71 mi)

Line 13 is an east-west line of the Shanghai Metro network. It is partially in operation: the western section between Jinyun Road and Shibo Avenue is open. The rest of the line is still under construction. The line is colored pink on system maps.

Stations

Station Name
English
Station Name
Chinese
Transfer
Location
Jinyun Road 金运路 Jiading
West Jinshajiang Road 金沙江西路
Fengzhuang 丰庄
South Qilianshan Road 祁连山南路 Putuo
Zhenbei Road 真北路
Daduhe Road 大渡河路
Jinshajiang Road 金沙江路  3  4 
Longde Road 隆德路  11 
Wuning Road 武宁路
Changshou Road 长寿路  7 
Jiangning Road 江宁路
Hanzhong Road 汉中路  1  12  Jing'an
Shanghai Natural History Museum 自然博物馆站
West Nanjing Road 南京西路  2  12 
Middle Huaihai Road 淮海中路 Huangpu
Xintiandi 新天地  10 
Madang Road 马当路  9 
World Expo Museum 世博会博物馆
Shibo Avenue 世博大道 Pudong
Changqing Road (closed) 长清路
Chengshan Road (closed) 成山路
Dongming Road (closed) 东明路
Liuli (closed) 六里
Xianan Road (closed) 下南路
Beicai (closed) 北蔡
East Chenchun Road (closed) 陈春东路
Lianxi Road (closed) 莲溪路
Middle Huaxia Road (closed) 华夏中路
Zhongke Road (closed) 中科路
Gebaini Road (closed) 哥白尼路
Zhangjiang Road (closed) 张江路

Important Stations

The Phases

Special Phase

The Special Phase of Line 13 was run between Madang Road and Shibo Avenue, during the 2010 Shanghai World Expo. After the Expo ended, this phase was closed afterwards.

1st Phase

The 1st Phase of Line 13 will run between Jinyun Road and Nanjing West Road, with 14 stations through four Shanghai districts. It is constructed in parts; the western section from Jinyun Road to Jinshajiang Road has opened in December 2012[2] and the remaining stations will open in December 2015. Tunnel excavation began in September 2009.[3]

2nd Phase

The 2nd Phase will run from Huaihai Middle Road in the CBD to Zhangjiang Road in the Zhangjiang Hi-Tech Park region. The stations up to Shibo Avenue will open in December 2015.

Rolling Stock

Type Time of manufacturing Series Sets Assembly Notes
Type A 2011–2014 AC18 72 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Puzhen

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Shanghai Eastday, 7 February 2012.
  3. Shanghai Daily September 5, 2009 http://www.shanghaidaily.com/sp/article/2009/200909/20090905/article_412839.htm


<templatestyles src="Asbox/styles.css"></templatestyles>