Midland railway line, Western Australia

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Midland railway line
Overview
Termini Midland Junction
Walkaway
Stations 39
Operation
Opened November 1894
Owner Public Transport Authority
Operator(s) Brookfield Rail
Technical
Line length 446 kilometres
Track gauge 1,067 mm (3 ft 6 in)

The Midland railway line runs from Midland Junction to Walkaway (30 kilometres south of Geraldton) in Western Australia. Built by the Midland Railway of Western Australia, the 446 kilometre line opened in November 1894.

History

File:MRWA plan, 1894.jpg
Map of the Midland railway line

In December 1883, John Waddington representing a sydndicate of English capitalists, proposed to Governor Broome to build a line from York via Northam, Newcastle, Bejoording, New Norcia and along the Berkshire Valley to Geraldton under a land grant scheme. A parliamentary select committee recommended the route be altered to branch off from the Eastern Railway at Guildford and run via Chittering, Bindoon, Victoria Plains, Carnamah, Arrino, Upper Irwin and Dongara to Walkaway where it would join the Western Australian Government Railway’s line from Geraldton. The agreement was signed on 27 February 1886, with work commencing a few days later.[1][2]

Under the land grant scheme, 12,000 acres (4,900 ha) of land was granted for every mile of railway completed, a total of 3,319,000 acres (1,343,000 ha). The consortium was able to select land within 40 miles (64 km) of the new railway. Financing problems delayed construction with construction being suspended in June 1887. The Government tried to rescind the contract, but could not as the consortium had until 1890 to complete the first 160 kilometres of the line.[1][2][3][4]

On 21 March 1890, the Midland Railway Company of Western Australia was floated on the London Stock Exchange and Herbert Bond purchased John Waddington's shareholding in the consortium and work recommenced on the 446 kilometre line from both ends.[1]

The first section from Midland Junction to Gingin opened on 9 April 1891, followed by Walkaway to Mingenew on 16 August 1891, Gin Gin to Moore River (Mogumbur) on 22 February 1892, Mingenew to Arrino on 25 February 1892, Mogumbur to Mora on 2 July 1894, with the two sections linked between Carnamah and Three Springs on 1 November 1894.[1][5][6][7]

On 1 August 1964, the line was sold to the Western Australian Government Railways.[6]

Services

The Midland Railway of Western Australia operated a weekly passenger train in each direction. After the sale of the line to the Western Australian Government Railways, it was relaunched as The Midlander. It ceased on 28 July 1975.[8][9]

Today the line is primarily utilised by CBH Group grain trains operating to the ports of Geraldton and Kwinana from eight receival points.[10]

References

  1. 1.0 1.1 1.2 1.3 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Midland Railway Company Battye Library
  3. The Midland Railway of Australia Western Mail 3 October 1891
  4. Royal Commission into the Management, Workings & Control of the Western Australian Government Railways Government of Western Australia December 1947 page 8
  5. The Midland Railway: Its Jubilee Year The West Australian 31 October 1936
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Midland Railway Carnamah Historical Society & Museum
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Receival site map CBH Group

External links