North–South Expressway (Singapore)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

NSE-SG.svg

North–South Expressway
Lebuhraya Utara-Selatan
南北高速公路
வடக்கு-தெற்கு விரைவுச்சாலை
North - South Expressway is labelled in single violet line
Route information
Length: 21.5 km (13.4 mi)
History: TBA
Major junctions
North end: Admiralty Road West
  SLE, PIE, CTE, ECP
South end: ECP, Republic Avenue and Nicoll Highway
Highway system
Expressways of Singapore

The North–South Expressway (Abbreviation: NSE) will be the 11th of Singapore's network of expressways when completed. The North South Expressway will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). This new expressway was announced on 30 January 2008 as part of a major review of Singapore's transport network by the Land Transport Authority (LTA). The 21 kilometres (13 mi) expressway would cost about S$7–8 billion when fully completed in 2023 as North-South Tunnel and will connect the East Coast Parkway (ECP) with the northern parts of Singapore.[1]

On 19 Jan 2011, the government gave the green light to build the expressway between Admiralty Road West and Toa Payoh Rise. On 15 November 2011, LTA unveiled the full alignment of the North-South Expressway. Advance work begun in 2013, and major construction works will commence in 2016.[2][3] The North South Expressway will have a total of 16 entrances and 17 exits to connect towns along the north-south corridor—Woodlands, Sembawang, Yishun, Ang Mo Kio, Bishan and Toa Payoh—with the city centre. The NSE will also provide links to existing expressways, including the Seletar Expressway (SLE), Pan-Island Expressway (PIE) and East Coast Parkway (ECP).[2]

Route

In the final plan, the NSE will commence at Admiralty Road West in northern Singapore and proceed southwards along Woodlands Ave 8, Gambas Ave, Sembawang Road. It will join Lentor Ave and intersect the Seletar Expressway. It will be a semi-tunnel between Ang Mo Kio Avenue 6 and Avenue 9, and an underground tunnel to Marymount Road. It will pass Toa Payoh Rise, join Thomson Road and Bukit Timah Road running parallel to the Central Expressway. The NSE will carry on along Ophir Road, joining the East Coast Parkway at its southern terminus.

Some land has to be acquired by the government for the project. The Land Transport Authority tried to utilize state land as far as possible, reducing the number of private properties that have to be acquired. Despite much of the expressway running underground at its southern end, some land had to be taken because of existing Mass Rapid Transit tunnels, and also because the expressway had to be straight to maintain traffic speeds. One of the prominent landmarks that has to make way for the project is the Rochor Centre.[4]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.