Eritrean Railway
Eritrean Railway | |||
---|---|---|---|
Eritrean railway, that now connects only Massawa and Asmara, showing a class 440 locomotive at work on the mountainous section between Arbaroba and Asmar
|
|||
Overview | |||
Status | Operational | ||
Locale | Eritrea | ||
Termini | Massawa Asmara (originally Bishia) |
||
Stations | 13 (originally 31) | ||
Operation | |||
Opened | Between 1887 and 1932 | ||
Closed | 1975 | ||
Reopened | 2003 | ||
Technical | |||
Line length | 118 kilometres (73 mi) (originally 337 kilometres (209 mi)) | ||
Track gauge | 950 mm (3 ft 1 3⁄8 in) | ||
|
The Eritrean Railway is the only railway system in Eritrea. It was constructed between 1887 and 1932 by the Kingdom of Italy for the Italian Eritrea colony and connected the port of Massawa with Bishia near the Sudan border. The line was destroyed by warfare in subsequent decades, but has been rebuilt between Massawa and Asmara. Vintage equipment is still used on the line.
Contents
Characteristics
The railway was built by the Italians in order to connect Massawa and Asmara, the main cities of Italian Eritrea.
In the 1930s Italian leader Benito Mussolini wanted to reach Kassala in Sudan, but his war to conquer Ethiopia and create the Italian Empire stopped the enlargement to Agordat and Bishia.
After damage suffered by the railway during World War II, the section between Massawa and Asmara was dismantled partially and was only rebuilt in the 1990s by the Eritrean authorities.
The railway is narrow gauge and is being rebuilt after the devastation wreaked upon it by the war of independence. Its newest equipment is over fifty years old, with most of it predating World War II.
It is one of the few railway systems still in existence (excluding tourist railways) using equipment like the 1930s Italian-built 'Littorina' railcars behind 1930s-vintage Mallet steam locomotives.
950 mm gauge
Eritrea was an Italian colony, and accordingly its railway was built by Italian engineers to Italian standards, using equipment bought from Italy. The gauge chosen was the Italian standard narrow gauge measurement of 950 mm (3 ft 1 3⁄8 in), similar to many common narrow gauge railways under construction in Italy at the same time.
With the short building time and the simultaneous flow of some common equipment and materials to the national railway yards, e.g. metallic plate ties (sleepers), it was necessary to acquire these from France to some extent.
A previous Italian law from 1879 officially established the track gauges, which specified the use of 1,500 mm (4 ft 11 1⁄16 in) and 1,000 mm (3 ft 3 3⁄8 in) gauge track measured from the centre of the rails, or 1,445 mm (4 ft 8 7⁄8 in) and 950 mm (3 ft 1 3⁄8 in), respectively, on the inside faces.[1]
Construction
Construction began from the Red Sea port city of Massawa in 1887, heading towards the capital city of Asmara. The "Decauville" railway was the first built, from Massaua to Saati, just 27 km.[2] Progress was slow, thanks to the long climb up the mountains to the high plateau of inland Eritrea, and the substantial civil engineering works required; the line reached Asmara in 1911. It was extended to Keren in 1922, Agat in 1925, Agordat in 1928, and finally Bishia in 1932, for a total length of 280 km (174 mi). Bishia (Biscia in Italian) proved to be the end, even though the builders had ambitions of reaching the Sudan Railways line. Mussolini's invasion of Ethiopia led to resources being diverted elsewhere, including the upgrading of the line from Massawa to Asmara to handle more traffic.
Building the line from Massawa to Asmara was a significant undertaking. Even with the tighter turns and narrower right-of-way allowed by a narrow gauge railway, the line required 65 bridges (including a fourteen-arch viaduct crossing the Obel River) and 39 tunnels,[3] the longest being 320 m (1,050 ft). Even so, there were still grades of more than 3%. The highest point on the railway is just east of Asmara at 2,394 m (7,854 ft) above sea level.
The construction of the railway was considered a fine achievement of the first half of the twentieth century.[4]
In operation
In 1935 it carried supplies for the Italian war effort in Ethiopia and the line saw 30 trains daily, while by 1965 the line was carrying nearly half a million passengers a year as well as 200,000 tons of freight. Things went downhill from there. Improvements to the road from Massawa to Asmara, and to the trucks and buses that used it, began to take traffic away from the railway.
Until 1941, the railway was Italian controlled, but the fortunes of war allowed the British to take control. After 1942 the railway (damaged during the British occupation and by Italian guerrillas) was abandoned from Agordat to Biscia.
In 1942 the British moved some diesel locomotives and materials to Eritrea when they dismantled the Railway Mogadiscio-Villabruzzi of Italian Somalia. In 1944 the British (as a war compensation) dismantled the Italian-built Asmara-Massawa Cableway that supplemented the railway as a means of transportation inland; the cableway equipment was sent south to Britain's colony Kenya.
In 1953 Eritrea was joined to Ethiopia in Federation as the British pulled out, giving Ethiopia a coastline, but starting off 40 years of unrest and eventually war.
The 1950s and 1960s were successful years for the railway, but in the 1970s the railway fell more and more out of use as the unrest intensified, and in 1975 the railway was destroyed by the ruling Derg regime in Ethiopia. Much of the infrastructure was destroyed during the following years of war, and both sides used materials salvaged from the railway for fortification and other purposes.
Rebuilding
Eritrea won its independence from Ethiopia in 1993, and in 1994 the Eritrean president declared that rebuilding the railway was a priority for the new nation. During the war years a spirit of self-reliance had been built up, and the Eritreans refused foreign loans and expensive rework. Instead, the Eritreans decided, they would rebuild what they had left with their own efforts. Rebuilding the line started, some work going into rebuilding the workshops and station in Asmara while others set to reconstructing the Massawa end. Renovation of the main line began from Massawa westbound, recovering rails and steel ties.
At the same time, restoration began on the remaining locomotives and rolling stock remaining after the conflict. Eleven steam locomotives survived, and at least six have been rebuilt to working order. In addition, several 1930s vintage Fiat 'Littorina' railcars survive and have been made operational, as well as two 1957 Krupp-built Bo-Bo diesels (the line's newest locomotives) and one of three surviving Drewry shunters, brought to the railway by the British during the war years. Finally, several road trucks have been converted to run on rail wheels. Much freight stock and a number of passenger cars also survive.[citation needed]
The line has been restored from Massawa to Asmara, but as of 2006[update] no scheduled services traverse the whole length of the line. Charter trains for tourists now do, and regular train services exist in certain areas. While the surviving equipment is sufficient for such a limited service, the purchase or building of more is necessary to provide a serious form of transportation over the length of the line. The Eritrean Railroad Authority has requested funding to continue the Italian-era plan to extend the route to Tesseney and provide an opportunity for Sudan to efficiently use the Port of Massawa. Mining companies in Eritrea have also inquired about use of the railway and its improvement.[5]
The surviving freight cars include a number of larger boxcars suitable for a limited freight service.
Equipment
Steam locomotives
Three classes of steam locomotive still exist; one design of 0-4-0 shunter and two designs of 0-4-4-0 Mallet for line service.
202 Series
These small 0-4-0 tank engines were and are the standard shunter locomotives of the system, built between 1927 and 1937 by the firm of Breda in Milan. They have short side tanks, a rear coal bunker, and a unified, oval dome containing the steam dome inside a larger sand dome. This arrangement, popular worldwide in nations that favored the sand dome, helped both to insulate the steam dome and to keep the sand dry with the warmth. Large, prominent builder's plates adorn the domes. They utilise Walschaerts valve gear with piston valves and superheating, and are painted in the traditional European style of red below the running board, including frames and wheels, and black above, including boiler, cab, tanks etc. The purpose of the red paint is to make cracks and breakages in the locomotive's important running gear more obvious.
Six of these engines survive, of which two were in running order and four in storage awaiting restoration.
440 Series
One of these early Mallet locomotives, which is a true Mallet and thus a compound, still exists in storage at the Asmara workshops. It was a 1915 product of Ansaldo in Genova.
442 Series
These later, and much larger, compound Mallet locomotives were built by Ansaldo in Genova in 1938 to largely replace the earlier types, both the 440 Series and the unsuccessful 441 Series. The latter were simple locomotives (i.e., non-compound) and found liable to run out of steam on the heavy grades of the line. Four of them are still in existence of which three are in running order.
These are the prime main-line steam locomotives of the railway, and are in high demand for tourist services. Two of them, double headed, are required to scale the steepest grades with a train of any length. Like the other locomotives they are tank engines with large side tanks and a rear coal bunker, under cover of the cab roof in this design.
Diesel locomotives
The railway possesses five diesel locomotives. They are in the process of being returned to working order.
Krupp Bo-Bo roadswitchers
The railway purchased two Krupp-built Bo-Bo roadswitchers of typical German offset-cab design in 1957, the newest motive power owned by the system and the only locomotives purchased after World War II. They are both still in working order. When the line's replacement is complete, it is intended to use them for hauling freight. The roadswitchers are painted in a creamy white with brown frames and trucks.
Drewry shunters
Three Drewry Car Co. built shunters are owned by the railway, and were brought to Eritrea by the British after their takeover in 1941. They were previously in service in the Sudan and were of a slightly wider gauge (1,067 mm (3 ft 6 in)) there; they were regauged to the railway's 950 mm (3 ft 1 3⁄8 in) gauge by turning them from an outside framed to an inside framed layout. Two are 0-6-0s and one is an 0-4-0; one of each is working while the third is under repair. They are painted in the same scheme as the Krupp units but lacking their bonnet sides and the engines are exposed.
Railcars
Three Fiat-built 'Littorina' railcars survived the civil war and two are in working order. They are Art Deco in style, with large Fiat radiators on the front. The bodies are painted in creamy white with grey underneath and roofs with red 'bumpers' on the ends and a red stripe separating the body color from the grey below. They are intended for tourist service; new vehicles will be built or bought for regular passenger service.
In addition, one 4-wheel railcar built by Brown Boveri of Switzerland exists out of service in the Asmara shops. It was apparently being used as a mobile generator car before the civil war.
For maintenance an improvised maintenance car is used, a four-wheeler built from a motor-cycle.
Rail trucks
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
A number of Russian-built light trucks have been converted to run on rail wheels. At present, they are being used in the railway's reconstruction.
Passenger cars
A number of passenger cars, all mounted on two four-wheel trucks, survive. They are fitted with wooden seats and have a platform at each end, one of which is for the brakeman — there are no continuous train brakes on the railway, and braking is either done with the locomotive's brakes or by manually applying the brakes on each car. They are now painted in an attractive livery of white with pale blue in a stripe above the windows and at the bottom of the bodywork.
Freight cars
Abandoned goods wagons sit on sidings near Asmara, and are being restored. Priority is being given to the 8-wheel (2 x 4-wheel truck) boxcars and flatcars, but a large number of 4-wheel cars still exist.
Couplings and brakes
Locos and wagons are equipped with a single centre buffer with a hook and screw chain underneath. There are no continuous brakes; instead a brakeman travels on each coach to apply braking when required.[6] However, a picture of a tank car shows hoses for some kind of continuous brake.[7]
Loading gauge
The structure gauge of the Eritrean Railway is small. Therefore, two test runs, one in 2006 another one in spring 2010 took place when ISO containers were carried on traditional flat wagons through all the tunnels along the line.[8] In December 2010 two ISO Containers of Maersk Line with equipment donated by the Danish State Railway for the rail workshops in Asmara travelled all the line with no problems.[9][10] It is not clear if the containers were 8 ft 0 in (2,438 mm) high or 9 ft 6 in (2,896 mm) high.
Route
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
The railway was fully opened in 1932. It ran from the port of Massawa westwards to Asmara, then extending northwards to Keren, Agordat and Bishia.
It was partially built from Bishia to Tesseney (and projected to reach Kassala, annexed to Eritrea in 1940 by the Italians) at the beginning of World War II, but this section was not finished when the British conquered Eritrea in 1941.
Until 1978 even the route Asmara-Keren remained partially active. As of 2009, the 118 kilometres (73 mi) section between Massawa and Asmara is open.
Mersa Fatuma-Kululi transport railway and Asmara-Massawa Cableway
The Eritrean Railway was complemented by the Asmara-Massawa Cableway, and by a small transport railway between Mersa Matuma and Kululi, nearly 90 km south of Massaua.
- Cableway: The cableway was built by Italy in the 1930s, and connected the port of Massawa with the city of Asmara. The cableway was the longest of its kind in the world at the time of its inauguration. It had 13 stations with diesel engines, with 1620 little transport wagoons. The British later dismantled it during their eleven-year occupation, after defeating Italy in World War II.
- Potash Transport Railway: A 42 kilometres (26 mi) long 600 mm (1 ft 11 5⁄8 in) gauge potash transport railway[11] built to serve the locations Adaito and Badda, located between Massawa and Assab. A 600 mm (1 ft 11 5⁄8 in) gauge line was built in 1905 by the Italians inside the port of Mersa Fatuma and from it into the hinterland until Kululi near the Ethiopian border.[12] Potash production is said to have reached about 50,000 metric tons after this railway was constructed. Production was stopped some years after World War I owing to large-scale supplies mainly from Germany. Unsuccessful attempts to reopen successful production were made in the period 1920-1941 by the Italian government. Between the years 1925-29 an Italian company mined 25,000 tons of sylvite, averaging 70% KCl, which was transported by rail to Mersa Fatuma. This was the main source of potash in Eritrea and had to cease most operations because of the Great Depression of 1929.[13]
See also
- Transport in Eritrea
- Railway stations in Eritrea
- Asmara-Massawa Cableway
- Mogadishu-Villabruzzi Railway
References
Notes
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Railway Massaua-Saati, built in 1887-1888 (in italian)
- ↑ The Eritrean Railway
- ↑ Detailed Map of the Railway between Massaua and Agordat in 1938
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Bernd Seiler: Eritrea – Eisenbahn zwischen Vergangenheit und Zukunft. In: LOK Report, Heft 4, S. 52–58.
- ↑ Christoph Grimm: Hilfsgüter für die Eisenbahn in Eritrea. In: Eisenbahn-Revue International 3/2011, S. 153–155.
- ↑ Farrail - Containers to Asmara
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Map of Italian Eritrea in 1936 with detailed railway route to Kululi (click on sections 4 and 7)
- ↑ Neil Robinson. World Rail Atlas and Historical Summary.North, East and Central Africa. London, 2009 (p.35-39). ISBN 978-954-92184-3-5
Further reading
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
External links
Wikimedia Commons has media related to Rail transport in Eritrea. |
- Articles that mention track gauge 950 mm
- Articles that mention track gauge 1500 mm
- Articles that mention track gauge 1000 mm
- Articles that mention track gauge 1445 mm
- Articles with unsourced statements from September 2009
- Articles that mention track gauge 1067 mm
- Articles that mention track gauge 600 mm
- Commons category link is locally defined
- Use dmy dates from December 2011
- Railway companies of Eritrea
- Italian East Africa
- 950 mm gauge railways in Eritrea