Rail transport in Europe

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Rail transport in Europe is characterised by its diversity, both technical and infrastructural.

Rail networks in Western and Central Europe are often well maintained and well developed, whilst Eastern, Northern and Southern Europe often have less coverage and/or infrastructure problems. Electrified railway networks operate at a plethora of different voltages AC and DC varying from 750 to 25,000 volts, and signalling systems vary from country to country, hindering cross-border traffic.

The European Union aims to make cross-border operations easier as well as to introduce competition to national rail networks. EU member states were able to separate the provision of transport services and the management of the infrastructure by Directive 91/440/EEC. Usually, national railway companies were split to separate divisions or independent companies for infrastructure, passenger and freight operations. The passenger operations may be further divided to long-distance and regional services, because regional services often operate under public service obligations (which subsidise unprofitable but socially desirable routes), while long-distance services usually operate without subsidies.

Differences between countries

Electrification systems:
  750 V DC
  1,5 kV DC
  3 kV DC
  Non-electrified

Rail gauge

While most railways in Europe use 1,435 mm (4 ft 8 12 in) standard gauge, in some other countries, like Spain or countries which territories used to be a part of Russian Empire and Soviet Union, widespread broad gauge exists. For instance in Spain it is 1,668 mm (5 ft 5 2132 in) (also known as Iberian gauge), while in Russia, Ukraine, Belarus, Finland, Baltic states gauge width is 1,520 mm (4 ft 11 2732 in) or 1,524 mm (5 ft) (also known as Russian gauge). Ireland uses the somewhat unusual 5 ft 3 in (1600mm) gauge, which is referred to in Ireland as "Irish Gauge". The reason for different track gauges between countries was mainly because of the idea of preventing trains running on "your" track from an invading country.

Electrification

Likewise, electrification of lines varies between countries. 15 kV AC has been used in Germany, Austria, Switzerland, Norway and Sweden since 1912, while the Netherlands uses 1500 V DC, France uses 1500 V DC and 25 kV AC, and so on. All this makes the construction of truly pan-European vehicles a challenging task and, until recent developments in locomotive construction, was mostly ruled out as being impractical and too expensive.

The development of an integrated European high-speed rail network is overcoming some of these differences. All high-speed lines outside of Russia, including those built in Spain and Portugal, use 1,435 mm (4 ft 8 12 in) standard gauge tracks. Likewise all European high-speed lines, outside of Germany and Austria, use 25 kV AC electrification. This means that by 2020 high-speed trains can travel from Italy to England, or Portugal to the Netherlands without the need for multi-voltage systems.

Signalling

Multiple incompatible signalling systems are another barrier to interoperability. The EU countries have 19 different signalling systems. A unified signalling system, ETCS is the EU's project to unify signalling across Europe. The specification was written in 1996 in response to EU Directive 96/48/EC. ETCS is developed as part of the European Rail Traffic Management System (ERTMS) initiative, and is being tested by multiple Railway companies since 1999. All new high-speed lines and freight main lines funded partially by the EU are required to use level 1 or level 2 ETCS signalling.

Loading gauge

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The loading gauge on the main lines of Great Britain, most of which were built before 1900, is generally smaller than in in mainland Europe, where the slightly larger Berne gauge (Gabarit passe-partout international, PPI) was agreed to in 1913 and came into force in 1914.[1][2] As a result, British (passenger) trains have noticeably and considerably smaller loading gauges and smaller interiors, despite the track being standard gauge.

This results in increased costs for purchasing trains as they must be specifically designed for the British network, rather than being purchased "off-the-shelf". For example, the new trains for HS2 have a 50% premium applied to the "classic compatible" sets which will be able to run on the rest of the network, meaning they will cost £40 million each rather than £27 million for the captive stock (built to European standards and unable to run on other lines), despite the captive stock being larger.[3]

Cross-border operation

Operational high-speed lines in Europe

The main international trains operating in Europe are:

  • InterCityExpress (Germany, The Netherlands, Belgium, France, Denmark, Switzerland and Austria)
  • Thalys (France, Germany, Belgium, The Netherlands)
  • Enterprise (Republic of Ireland & Northern Ireland (UK))
  • Eurostar (Great Britain, France, Belgium)
  • EuroCity/EuroNight (conventional trains operated by nearly all Western and Central European operators, with the notable exception of the United Kingdom and Ireland)
  • TGV (France, Belgium, Italy, Switzerland, Germany, Luxembourg)
  • CNL (Germany, Italy, Austria, Switzerland, France, Denmark, Czech Republic)
  • Elipsos (France, Spain)
  • Trenhotel (France, Spain, Portugal)
  • Oresundtrain (Denmark, Sweden)
  • SJ 2000 (Sweden, Norway, Denmark)
  • NSB (Sweden, Norway)
  • Allegro (Finland, Russia)
  • Railjet (Austria, Germany, Switzerland, Hungary, Czech Republic by 2014)
  • Belgrade-Bar Railway (Serbia, Montenegro)

Additionally, there are a lot of cross-border trains at the local level. Some local lines, like the Gronau to Enschede line between Germany and the Netherlands, operate on the signalling system of the country the line originates from, with no connection to the other country's network, whilst other train services like the Saarbahn between Germany and France use specially equipped vehicles that have a certificate to run on both networks. When there is an electrification difference between two countries, border stations with switchable overhead lines are used. Venlo railway station in the Netherlands is one such example, the overhead on the tracks can be switched between the Dutch 1500 V DC and the German 15 kV AC, which means a change of traction (or reconfiguring a multiple-voltage vehicle) is necessary at the station.

Metres of European railways and motorways per capita in 2013.

Subsidies

European rail subsidies in euros per passenger-km for 2008[4]

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

EU rail subsidies amounted to €73 billion in 2005.[5] Subsidies vary widely from country to country in both size and how they are distributed, with some countries giving direct grants to the infrastructure provider and some giving subsidies to train operating companies, often through public service obligations. In general long-distance trains are not subsidised, but short-distance trains are, for example in 2013 59% of the cost of short-distance passenger rail transport in Germany was covered by the state.[6]

Total railway subsidies by country

Country Subsidy in billions of Euros Year
 Germany 17.0 2014[7]
 France 13.2 2013[8]
 Italy 7.2 2010[9]
 Spain 5.1 2015[10]
 United Kingdom 4.5 2015[11]
  Switzerland 4.3 2012[12]
 Belgium 2.8 2012[13]
 Netherlands 2.5 2014[14]
 Austria 2.3 2009[15]
 Denmark 1.7 2008[16]
 Sweden 1.6 2009[17]
 Poland 1.4 2008[16]
 Ireland 0.91 2008[16]

Harmonising rules

See also

External links

References

  1. Berne loading gauge
  2. A Word on Loading Gauges.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. 16.0 16.1 16.2 Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.