Trianel Windpark Borkum
Borkum West II | |
---|---|
Location of Borkum West II in Germany
|
|
Country | Germany |
Location | 45km North of Borkum island |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational (Ph I) |
Construction began | September 2011 |
Commission date | July 2015 (phase I)[1] |
Construction cost | EUR900m (Phase 1) ? (Phase 2) |
Owner(s) | Trianel + 33 municipal utilities |
Operator(s) | Trianel |
Wind farm | |
Type | offshore |
Max. water depth | 28 - 33m |
Distance from shore | 45km (65.6km for center) |
Rotor diameter | 116m |
Power generation | |
Units operational | 40 (Phase 1) |
Nameplate capacity | 200 MW (Ph I), 200 MW (Ph II) |
Website Trianel wind farm Borkum |
Trianel Windpark Borkum (formerly Borkum West II) is a 200+200MW wind farm partially in operation near Borkum.[2] The project was approved for construction in 2008[3] and will cost over €1 billion to construct once fully operational (€900m for phase I alone). The wind farm will have 80 wind turbines. Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013.
Phase 1 of the installation was completed in the 4th quarter of 2014 and consist of 40 Areva M5000-116 turbines (5MW turbines).[4] It was connected to the grid in August 2015 [5]
Phase 2 of the installation will consist of 40 Adwen AD 5-135 (5MW turbines).[6]
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>