Walk of the Amazon Heroes

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Walk of the Amazon Heroes
Type Boulevard median
Location  Peru, Iquitos
Area Width:
4.20 meters
Length:
1,995 meters
Created 08:00:00, January 4, 2010 (UTC-5) (2010-01-04T08:00:00UTC-5)[1]
Operated by Maynas Municipality, Iquitos
Visitors Recurrent
Status Open all eyer, public site

The Walk of the Amazon Heroes (Spanish: Paseo de los Héroes Amazónicos, Spanish pronunciation: [paˈse.o ðe los ˈeɾo.es amaˈθonikos])[2][3][4] is a museologic boulevard median, only pedestrian, along Avenue Mariscal Cáceres in Iquitos, Loreto, Peru. It is a recent place in the city. It was built around 2009 and opened in early 2010. It is mainly dedicated to the heroes who gave their lives to protect the Amazonian people during the various battles, including those in Güeppí.

The Walk is a type of boulevard-median of 4 meters in central of Avenue, which separates the two-lane road East and West, with a slab path and sides decorated with 40 busts of heroes on pedestals, in addition to 43 lamps, ornamental flower gardens and some seats sheltered by small transparent awnings. During the night, each bust gets its own lighting: a focus located across the bust, the other side. The walk begins tangent at Avenue Miguel Grau with the statue of a soldier holding the Flag of Peru, and in turn, rests on a pedestal largest, known as The Unknown Soldier (El Soldado Desconocido). The edges of the walk are protected by balustrades chain to prevent pedestrians walked over the gardens. The current two-lane road East and West, measuring 5 meters, improving traffic.

Only four long blocks of the walk is decorated with busts (up the street Ramón Castilla), continuing the following parts of the pavement (without them, but with the same care ornamental) to reach the coastal street of Lake Moronocha's Caballero Lastre, one of the western confine of Iquitos.

References

  1. Inauguran el paseo de los Héroes Amazónicos Issued 04-01-2010. Consulted 02-04-2010
  2. Obra en la avenida Cáceres ingresa a su etapa final Issued 06-Oct-2009. Consulted 2-Abr-2010
  3. Mariscal Cáceres avanza a paso acelerado Issued 27-Sep-2009. Consulted 2-Abr-2010
  4. Inician modernización de avenida Cáceres Issued 15-Mar-2009. Consulted 2-Abr-2010