Fairbank (TTC)
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
Location | 1815 Eglinton Avenue West,[1] Toronto, Ontario Canada |
||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. | ||||||||||
Platforms | Centre platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | TTC buses | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
Architect | IBI Group Architects and SNC-Lavalin[1] |
||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | 2021[2] | ||||||||||
Services | |||||||||||
|
Fairbank,[2] which had a working name of Dufferin, is an LRT station under construction on the Toronto Transit Commission's Eglinton Crosstown line.[3] It will be located in the Fairbank neighbourhood at the intersection of Dufferin Street and Eglinton Avenue West. It is scheduled to open in 2021.
The main entrance will replace the Esso gas station on the east side of St. Hilda's Park, at the southeast corner of Dufferin Street and Eglinton Avenue.[4] A secondary entrance will be on the northwest corner, where a right-turn slip road will be removed to provide the necessary space. A third structure, for mechanical and venting purposes, will replace a storefront near the southwest corner.[3]
Construction work related to the station will begin in 2014.[4]
Destinations include the Fairbank neighbourhood and Fairbank Memorial Park.
In a report to the TTC Board on 23 November 2015, it was recommended that stations on Line 5 Eglinton LRT should be given unique names.[2]
References
External links
- Dufferin Station project page at the Eglinton Crosstown website.
- Lua error in package.lua at line 80: module 'strict' not found.
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>