File:SASPhase1TBMBreakthrough.jpg

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Original file(2,400 × 1,594 pixels, file size: 3.83 MB, MIME type: image/jpeg)

Summary

Workers completed tunneling for the first phase of the <a href="https://en.wikipedia.org/wiki/Second_Avenue_Subway" class="extiw" title="w:Second Avenue Subway">Second Avenue Subway</a> on Sept. 22, 2011, when the project's tunnel boring machine reached the <a href="https://en.wikipedia.org/wiki/BMT_63rd_Street_Line" class="extiw" title="w:BMT 63rd Street Line">BMT 63rd Street Line</a>, breaking into the <a href="https://en.wikipedia.org/wiki/New_York_City_Subway" class="extiw" title="w:New York City Subway">existing subway system</a>. The 485-ton, 450-foot-long TBM used a 22-foot diameter cutterhead to mine 7,789 linear feet in two tunnels, averaging approximately 60 linear feet a day.

Licensing

Lua error in package.lua at line 80: module 'strict' not found.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:57, 6 January 2017Thumbnail for version as of 02:57, 6 January 20172,400 × 1,594 (3.83 MB)127.0.0.1 (talk)Workers completed tunneling for the first phase of the <a href="https://en.wikipedia.org/wiki/Second_Avenue_Subway" class="extiw" title="w:Second Avenue Subway">Second Avenue Subway</a> on Sept. 22, 2011, when the project's tunnel boring machine reached the <a href="https://en.wikipedia.org/wiki/BMT_63rd_Street_Line" class="extiw" title="w:BMT 63rd Street Line">BMT 63rd Street Line</a>, breaking into the <a href="https://en.wikipedia.org/wiki/New_York_City_Subway" class="extiw" title="w:New York City Subway">existing subway system</a>. The 485-ton, 450-foot-long TBM used a 22-foot diameter cutterhead to mine 7,789 linear feet in two tunnels, averaging approximately 60 linear feet a day.
  • You cannot overwrite this file.

The following 2 pages link to this file: