Posadas-Encarnación International Train

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Posadas–Encarnación
International Train
200px
250px
Train running San Roque bridge in 2015
Overview
Service type Commuter rail
Status Active
Locale Misiones Province
Itapúa Department
First service 2014
Current operator(s) Casimiro Zbikoski[1]
Former operator(s) Ferrocarriles Argentinos
Ridership 11,000 per day[2]
Route
Start Apeadero Posadas
Stops 2
End Encarnación
Distance travelled 8 km (5.0 mi)
Average journey time 10 minutes
Service frequency 30 minutes
Line used Urquiza
Technical
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification none
Track owner(s) Government of Argentina
Route map
0.0
Posadas, Misiones
hKRZWae
San Roque bridge (Length: 2,550 m)
4.7
Encarnación, Paraguay

The Posadas–Encarnación International Train is a 8 km (5.0 mi) commuter rail international service operated between Posadas in Argentina and Encarnación in Paraguay, running on the Urquiza Railway standard gauge tracks. The service was opened in January 2014.[1][3]

Overview

Trains are run by private company Casimiro Zbikoski S.A. under an operation agreement with State-owned Operadora Ferroviaria Sociedad del Estado (SOFSE).[1] The train crosses the San Roque González de Santa Cruz Bridge which joins the two countries together and has an average journey time of 10 minutes with a 30-minute frequency.[4]

Apeadero Posadas (above) and Encarnación stations, both terminis

The current rolling stock consists of two-carriage diesel-hydraulic railcars originally called "Wadloper", built between 1981 and 1983 by German company Duewag for the Dutch railway company Nederlandse Spoorwegen,[1] and have a capacity to carry 250 people. Those railcars had been previously used in the binational service Tren de los Pueblos Libres that joined Argentina and Uruguay,[5] having been active only for one year.[6]

With passenger numbers increasing rapidly after the opening of the service, the Argentine Ministry of the Interior and Transport stated in March 2015 that it may have to evaluate adding more rolling stock and extending the length of the platforms.[2]

In August 2015, the service was suspended for an unspecified period of time, with no reasons given from both, the concessionaire –Casimiro Zbikoski– and Trenes Argentinos. At the time of the service being suspended, the train had carried 250,000 people within the year.[7] On the other hand, the Government of Paraguay stated that they had no objections to anything related to the service, blaming the Argentine authorities for the suspension of the train.[8] Other versions affirmed that the service could be reestablished the second week in September.[9][7] On 7 September, service resumed as normal, though the three-week interruption had not been explained.[10]

File:Interior of Posadas-Encarnación International Train.jpg
The interior of the Posadas-Encarnación International Train, September 2023

See also

References

  1. 1.0 1.1 1.2 1.3 Tren a Posadas – Encarnación: con una escribana pública en la redacción de Misiones Online, la empresa Casimiro Zbikoski SA pidió derecho a réplica, Misiones Online, 22 Mar 2019
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • No URL found. Please specify a URL here or add one to Wikidata.