File:Reinventing Boring (44544295190).jpg
Overview
Other name(s) Hawthorne test tunnel
Location Hawthorne, California
Coordinates <templatestyles src="Plainlist/styles.css"/>
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
Route West 120th Street
Start SpaceX Parking Lot
No. of stations 3
Operation
Work begun December 17, 2016
Operator The Boring Company
Character Limited access
Technical
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).[1]
Number of lanes 1
Operating speed 127 mph (205 km/h)[dubious ][2]
Width 12.5 feet (3.8 m)

The Boring Test Tunnel is a 1.1 miles (1.8 km) tunnel in Hawthorne, California for testing hyperloop and loop-based transportation.[3] It was completed by The Boring Company in late 2018. The single-bore tunnel was constructed during 2017‒2018 using a 14-foot (4.2 m) diameter tunnel boring machine, giving a finished 12-foot (3.8 m) internal diameter.

Route

Template:Boring Test Tunnel Lua error in package.lua at line 80: module 'strict' not found.


Most of the route runs outside and set back from the perimeter of Hawthorne Municipal Airport, with a very short section under the corner of the airport fence, without going under the runway.[4]

The tunnel starts between the Dominguez Channel storm drain and Crenshaw Boulevard at an entrance pit constructed on parking lot land owned by SpaceX. A short straight section heading northwards is followed by a Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). curve westwards under West 120th Street, then a long straight tunnel, a slight curve and a final short straight to the Exit Shaft. The midpoint of the tunnel is planned to connect with a very short northwards spur to a small car parking system-style car elevator leading up inside a residential garage behind a house at 3834 West 119th Place.[5]

Timeline

On December 17, 2016, Elon Musk stated that he was frustrated with traffic jams, and would start building a tunnel.[6] By April 2017, The Boring Company had obtained a second-hand tunnel boring machine, transported the machine to Hawthorne, and had it repainted in Boring Company colors.[7]

On January 31, 2018, the Boring Company acquired the land around a family house at 3834 West 119th Place for $500,000.[8] On May 9, 2018, the Boring Company acquired land on the corner of West 120th and Prairie Avenue for $2 million, purchasing the corner plots 309 and 308 at 12007 Prairie Avenue[9] and Plots 304‒307 behind.[10]

On October 5, 2018, the Hawthorne City Council granted an easement for up to 2,600 meters (8,600 ft) of tunnel, in exchange for a structural encroachment fee of $2.5 million. Permission for the first 210 meters (700 ft) of tunnel under SpaceX's own land had been obtained earlier.[11]

On October 17, 2018, in preparation for opening "The Brick Store", the company applied for permission to paint the building at 12003 Prairie Avenue in The Boring Company black-and-white corporate colors.[12]

An opening ceremony for the test tunnel was originally scheduled for December 10, 2018,[13] then moved to December 18, 2018.[14]

Operation

During the launch day on December 18, 2018, cars operated using guided busway-style side-facing guide wheels. This fleet of Tesla Model X vehicles travelled at up to 40 miles per hour (65 km/h).[15]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Official website
  • Geographic data related to Boring Test Tunnel at OpenStreetMap
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.