Lake Cargelligo railway line
Lake Cargelligo Line | |
---|---|
The Lake Cargelligo railway line is a railway line in Central Western New South Wales, Australia. The first sod was turned commencing construction on 8 June 1913[1] with the line opening on 13 November 1917.[2] The line branches from the Main South line at Cootamundra and travels in a north-westerly direction to the small town of Lake Cargelligo. The line is used primarily for grain haulage, although passenger service was provided until 1983.[3]
The section between Cootamundra and Stockinbingal forms part of the cross country line between the Main South and Broken Hill line, which allows goods trains to bypass Sydney.
In December 2007, flooding washed away several sections of track between Ungarie and Lake Cargelligo rendering the track unpassable.[4]
Contents
Early operations
From the opening of the line in 1913 daily passenger services were operated by mixed goods and passenger steam trains, the passenger carriages being 'dog box' configuration. It was not until 1938 after much complaint by passengers that more comfortable 'corridor' type passenger carriages were introduced on the branch line to Lake Cargelligo.[5] In the same year after more agitation from residents serviced by this line[6] the Railway Commissioners agreed to a new diesel rail motor service to operate between Temora (departing daily at 08:30am) and Lake Cargelligo, the new train commenced from late 1938 replacing the mixed steam trains that had operated since opening.[7] Later CPH railmotors operated on this line until passenger services were ceased in 1983.
Management
The line is owned by the Rail Infrastructure Corporation of New South Wales, however the section between Cootamundra and Stockinbingal is leased by the Australian Rail Track Corporation (ARTC) who are responsible for the maintenance and operation of the line.[8] The ARTC is responsible for co-ordinating operations over the remainder of the line.
Gallery
-
Tullibigeal Lake Cargelligo Rail Line.JPG
Near Tullibigeal
-
Tullibigeal Pedestrian Rail Crossing Sign.JPG
Tullibigeal crossing
-
Tullibigeal Silo 001.JPG
Tullibigeal Silo
-
Tullibigeal Silo 002.JPG
Tullibigeal Silo
-
CPH 24, 25 and 12 railmotors at Stockinbingal railway station.jpg
Stockinbingal railway station
-
Stockinbingal railway station (1).jpg
Stockinbingal railway station
See also
Further reading
The Centenary of Lake Cargelligo and the Railway's Role - Australian Railway Historical Society Bulletin, October, 1973, pp217–239
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Banger, C. The Intercapital Daylight, 1956-1991 Australian Railway Historical Society Bulletin, Vol 52 No. 764. June 2001
- ↑ NSW Infrastructure Update, Railway Digest March 2008 p13
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
External links
Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons
- Pages with broken file links
- Articles with dead external links from October 2010
- Use dmy dates from January 2012
- Use Australian English from January 2012
- All Wikipedia articles written in Australian English
- Regional railway lines in New South Wales
- Standard gauge railways in Australia
- Railway lines opened in 1917