Mid County Parkway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Mid County Parkway
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value).
Route information
Maintained by RCTC
Length: 16 mi (26 km)
Existed: In Progress – present
Major junctions
West end: I-215 in Perris
East end: SR 79 in San Jacinto
Highway system

The Mid County Parkway is a proposed 16-mile (26 km) highway in Riverside County, California, United States which would link San Jacinto in the east and Perris in the west in response to high levels on congestion on existing routes. The corridor was identified by the Riverside County Integrated Project. Construction is set to begin around 2014. [1]

Route description

The corridor is planned to begin at SR 79 in San Jacinto and follow or replace Ramona Expressway up to Lake Perris, where Ramona Expressway branches northwest, from where it will continue west. Options include a route west to Interstate 215, connecting to the interstate at Placentia Avenue, or turning north and connecting with Interstate 215 near Cajalco Expressway and Ramona Expressway. [2]

The project originally consisted of a longer 32-mile (51 km) highway from San Jacinto through Perris to Interstate 15 in Corona, but due to environmental, community and financial concerns, the $3 billion project was cut in half with the removal of the proposed Perris to Corona portion of the corridor.[3][4]

References

External links