Türksat 6A

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Türksat 6A
Mission type Communication
Operator Turksat
Mission duration at least 15 years
Spacecraft properties
Manufacturer TÜBİTAK Uzay, TAI, ASELSAN, CTech
Power min. 140 W each Ku band transponder
min. 150 W each X band transponder
Start of mission
Launch date 2017/2018
Orbital parameters
Reference system Geocentric
Regime Geostationary
Longitude 42° East
Transponders
Band 16 Ku band (plus 4 in reserve)
2 X band (plus 1 in reserve)
Bandwidth 7.3-18.1 GHz uplink
11.7-12.75 GHz downlink
Coverage area 3 zones (Ku band transponders)
Turkey only (X band transponders)

Türksat 6A is a Turkish communications satellite under construction, which will be developed and produced indigenously to be operated by Turksat.

History

According to an agreement signed on December 15, 2014, the satellite will be developed and manufactured indigenously by specialists under the leadership of TÜBİTAK Space Technologies Research Institute (TÜBİTAK Uzay) in cooperation with Turkish Aerospace Industries (TAI), ASELSAN and CTech. TAI will be in charge of design and production of the satellite structure and the subsystems such as spacecraft thermal control, chemical propulsion, harness and mechanical ground equipment needed to support the mission. TAI and TÜBİTAK Uzay will cooperate for the development of the software for satellite on-board data handling as well as for satellite command and control. They will perform the assembly, integration and test activities together at the TAI's Satellite Assembly Integration and Test Facility (Turkish: Uydu Montaj Entegrasyon ve Test) (UMET) in Akıncı, Ankara.[1][2][3] Türksat 6A will also have X-band satellite communication capability for use by the Turkish Armed Forces.[1] ASELSAN, the Turkish military electronic systems producer, signed for this purpose a contract worth of CA$30 million with the Canadian company MacDonald, Dettwiler and Associates (MDA) in April 2014.[4]

Launching of the spacecraft is planned for 2017 or 2018.[4][5] It will be in a geosynchronous orbit positioned at 42° East with an expected on-orbit life time of at least 15 years. It will consist of 16 Ku band transponders, additionally 4 in reserve as well as two active and one in reserve X band transponders. The Ku band transponders will have a bandwidth of 7.3-18.1 GHz for uplink and 11.7-12.75 GHz downlink bandwidth. Each of the Ku band transponders will have a minimum power of 140 W and the X band transponders at least 150 W each.[6]

While the X band transponders will cover the territory of Turkey only, the Ku band transponders of Turksat 6A will have three coverage zones:[6]

  • entire Turkey,
  • "West Zone" covering the British Isles in the west, Scandinavian countries in the north, North Africa in the south, Caspian Sea in the east,
  • "East Zone" covering Anatolia in the west, Russian Federation in the north, Saudi Arabia and Pakistan in the south, China national boundary in the east.

It is estimated that the project will cost about US$250 million.[1]

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.

External links