Tauern Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Tauern Railway
320px
Railjet 793 near Bad Hofgastein, Salzburg
Overview
Native name Tauernbahn
Type Mountain railway
Inter-city rail
Status Operational
Locale Salzburg, Carinthia
Termini Schwarzach-St. Veit
Spittal-Millstättersee
Stations 21
Line number 222 01
Operation
Opened Stages between 1905–1909
Owner Austrian Federal Railways
Operator(s) Austrian Federal Railways
Technical
Line length 79 km (49 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 247 m (810.4 ft)
Operating speed 130 km/h (81 mph)
Maximum incline 3.0 %
Route number 220
Route map
km
0.000
Schwarzach-St. Veit
Untersberg Tunnel (270 m)
Kenlach Tunnel (314 m)
Birgl Tunnel (960 m)
5.431
Loifarn
(since 2006 no passenger services)
6.800
Loifarn-Süd
7.103
7.422
break in kilometrage (-319 m)
Lower Klamm Tunnel (739.38 m)
Oberer Klamm Tunnel (744.01 m)
9.292
9.337
Loifarn 1 turnout (break in kilometrage (-45 m))
Klammstein
( closed 01.06.1991)
hKRZWae
14.313
Dorfgastein
19.281
Bad Hofgastein
22.360
Bad Hofgastein stop
22.570
Bad Hofgastein 1 turnout
exhKRZWae hKRZWae
Angerschlucht Bridge
New bridge (138 m)
25.390
Angertal
since 2006 no passenger services
27.662
turnout Angertal 1
27.840
27.900
break in kilometrage (-60 m)
30.078
Bad Gastein
hKRZWae
Nassfelder Ache
hKRZWae
Anlaufbach
34.183
Böckstein 20px
34.200
34.204
break in kilometrage (-4 m)
34.816
Tauern Tunnel (8370 m)
43.187
Tauern Tunnel
( closed 2001)
43.347
Mallnitz-Hintertal20px
hKRZWae
Seebach
45.110
Mallnitz-Nord
45.932
Mallnitz-Obervellach formerly Mallnitz
46.000
46.862
break in kilometrage (-862 m)
exSTR+l eABZgr
Dösen Tunnel (891.19 m)
47.635
Kaponig Tunnel (5096 m)
51.738
Mallnitz-Obervellach crossover 2
51.767
Kaponig formerly Obervellach
closed 1999
52.731
Upper Kaponig Tunnel (236.05 m)
exSTRl exSTR+r
Rescue gallery
Ochenig Tunnel (690 m)
Lower Kaponig Tunnel (789.22 m)
Upper Lindisch Tunnel (260 m)
hSTRae
Lindischgraben Bridge (283 m)
Lower Lindisch Tunnel (379 m)
55.819
Oberfalkenstein
Leutschach Tunnel (247 m)
Falkenstein Tunnel (67 m)
hKRZWae
Falkenstein Bridge (396 m)
Gratschach Tunnel (357 m)
hKRZWae
Pfaffenberg Bridge (377 m)
Pfaffenberg Tunnel (499 m)
Zwengenberg Tunnel (391 m)
eABZg+l exSTRr
57.942
58.300
break in kilometrage (-358 m)
58.417
Penk
hKRZWae
Mölltheuergraben Bridge (94 m)
hKRZWae
Litzelsdorfergraben Bridge (185 m)
hKRZWae
Rieckenbach Bridge (190 m)
64.790
Kolbnitz
69.124
Kolbnitz crossover 2
69.360
Mühldorf-Möllbrücke
69.428
Bahnhof Mühldorf-Möllbrücke
replaced by Kolbnitz crossover 2
72.904
Pusarnitz
74.000
Pusarnitz-Süd
ABZg+r
74.394
Line 407 01 turnout
80.897
Spittal-Millstättersee
Drava Valley Railway to Villach and Maribor
km
Source: Austrian railway atlas[1]

The Tauern Railway (German: Tauernbahn) is an Austrian railway line between Schwarzach-Sankt Veit in the state of Salzburg and Spittal an der Drau in Carinthia. It is part of one of the most important north-south trunk routes (Magistrale) in Europe and also carries tourist traffic for the Gastein Valley. The standard gauge railway line is 79 km (49 mi) long and climbs the High Tauern range of the Central Eastern Alps with a maximum incline of 2.5%, crossing the Alpine crest through the 8,371 m (27,464 ft) long Tauern Tunnel. It is one of the highest standard gauge railways in Europe and the third highest in Austria.

History

Since the opening of the Suez Canal in 1869, the Cisleithanian government of Austria-Hungary had urged for a direct connection of the restored main Austrian seaport at Trieste with the Bohemian coalfields and iron works in the northern parts of the Monarchy. After lengthy discussions, the building of the Tauernbahn was set up as a part of the larger "New Alpine Railways" investment project, pushed by the newly established k.k. Railway Ministry under Heinrich von Wittek from 1901 onwards.

File:Lageplan-der-Tauernbahn-(1921).jpg
Map of the Alpine Railways, 1921

Construction was executed by the public Imperial Royal Austrian State Railways to achieve an alternative route bypassing the Southern Railway line from Vienna to Trieste via the Semmering railway operated by the private Austrian Southern Railway company. Other sections built in the course of this infrastructure investment were the Karawanks Railway from Villach to Jesenice, continued by the Bohinj Railway (Wocheiner Bahn) leading through the Julian Alps to Trieste, as well as the railway line from the city of Linz across the Pyhrn Pass to the Selzthal rail hub.

Construction of the Tauern Tunnel began on 24 June 1901, the northern ramp from Schwarzach-St. Veit was built from 1902 onwards. Significant construction cost overruns triggered fierce debates in the Austrian Imperial Council, nevertheless on 20 September 1905 the first section of the line up to Bad Gastein station was ceremonially opened by Emperor Franz Joseph I, Minister-President Paul Gautsch von Frankenthurn, and Archbishop Cardinal Johannes Katschthaler. The southern ramp down to Spittal an der Drau was erected from 1906 under the supervision of the Viennese engineer and entrepreneur Wilhelm Carl Gustav von Doderer, father of the writer Heimito von Doderer. The railway line was completed in 1909 and inaugurated by the emperor at Spittal station on 5 July.

The tunnel itself had been built double-track, the northern and southern sections only single-track. The Obervellach station near the southern tunnel exit, situated on a slope 365 m (1,198 ft) above the village, from 1931 could be reached by a cable car, that was dismantled in 1976. In 1999 the Obervellach station was finally abandoned and relocated to Mallnitz. In 1933-35 the Tauern Railway line was completely electrified. From 1969 onwards further sections were restored to double track including several new passages, viaducts and straightenings to cope with the high traffic load and to allow higher travelling speeds. The southern ramp down to Pusarnitz was completed double-track in 2009, while parts of the former track bed between Mallnitz and Obervellach were turned into a hiking trail. A new double-track bridge in the Gastein valley was put into operation in 2016.

Rail service

File:1043 004 1998-04-08 Mallnitz.jpg
ÖBB Class 1043 Tauernschleuse shuttle train in Mallnitz

Since 1920 car shuttle trains (Tauernschleuse) through the Tauern Tunnel ply between the stations of Bad Gastein-Böckstein and Mallnitz. Up to World War II, the Tauern Railway mainly served Austrian domestic rail service, with a few links to Yugoslavia (Zagreb, Belgrade, and the Adriatic coast). After the war, the number of international train services to Southeast Europe increased as the main route via Bratislava and Budapest was blocked by the Iron Curtain. From 1951 to 1988 the Tauern-Express ran from Ostend to Yugoslavia, including through coaches to Athens and Istanbul, frequently used by migrant workers (Gastarbeiter) in West Germany.

Long-distance services have decreased since the Yugoslav Wars in the 1990s, and by competition from expanded road connections and cheaper flights. Today the Tauern Railway provides EuroCity service to Zagreb and ÖBB InterCity connections link Salzburg with Klagenfurt, partially served by Railjet trains.

See also

Footnotes

  1. Railway Atlas 2010, pp. 60, 76, 77.

Sources

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

External links

Lua error in package.lua at line 80: module 'strict' not found.