Tempe Streetcar

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Tempe Streetcar
250px
Downtown Tempe, which will see streetcar service for the first time as part of the Tempe Streetcar project
Overview
Type Streetcar
System Valley Metro Rail
Locale Tempe, Arizona, United States
Termini Marina Heights
Dorsey Lane
Stations 14
Services 2
Website www.valleymetro.org/tempestreetcar
Operation
Opened 2019 (planned)
Owner Valley Metro
Operator(s) Valley Metro
Technical
Line length 3.44 mi (6 km)
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Route diagram

Tempe Streetcar is a future extension of Phoenix, Arizona's Valley Metro Rail system that is proposed to begin construction in 2017, with a projected completion in 2019. When completed, it will link various parts of the city's downtown, as well as the Tempe campus of Arizona State University.[1][2][3]

Background

Tempe Streetcar will consist of 13 stations, running from Dorsey Lane east on Apache Boulevard, then north on Mill Avenue.[4] From there, it will loop around Downtown Tempe along Mill and Ash avenues.[5] The route continues along Rio Salado Parkway to Marina Heights, with a possible extension to Mesa to connect with the Chicago Cubs' new spring training facility, as well as Tempe Marketplace and future development along Rio Salado.[6][7] Once completed, a transfer from light rail to the streetcar at the 3rd Street station will permit travel to Gammage Memorial Auditorium at Arizona State University to the south and the Hayden Ferry and Marina Heights office complexes to the north.

Construction will cost between $175 and $190 million and will be funded using the Proposition 400 sales tax and federal grants.[4] In February 2016, the project was identified in President Barack Obama's budget for Fiscal Year 2017. A total of $75 million was dedicated to the project and would supplement the Proposition 400 funds, as well as local funds and other federal grant funds.[8]

Rolling stock

In 2011, Kinki Sharyo offered a demonstration model of their ameriTRAM vehicle, to allow members of the public to provide feedback on the vehicle.[9]

Valley Metro will issue an RFP to obtain vehicles for this route in the summer of 2016,[10] potential suppliers include Alstom, Bombardier, CAF USA, Kinki Sharyo, Siemens or TIG/m. Depending on the final design of the system, as well as availability of funding, vehicles for this line may operate on a combination of battery power, overhead catenary wires or on-board hydrogen fuel system.[11][12]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".