Trestles Bridge
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
Trestles Bridge, more formally known as Railroad Bridge 207.6 or the San Mateo Creek Bridge, is a low railroad viaduct on the coast of Southern California, in northern San Diego County near its border with Orange County. The bridge lies within San Onofre State Beach and gave its nickname to the famed Trestles surfing site at that beach.[1][2][3][4][5]
Contents
Usage
The bridge, carrying a single railway track, forms part of the only northern rail connection out of San Diego and part of the LOSSAN Corridor, the second busiest segment of railway in the United States. Approximately 45 trains per day and 2.7 million people per year travel on the bridge; it is used by Amtrak's Pacific Surfliner trains, the Orange County Line of the Metrolink commuter rail service, and freight trains on the BNSF Railway.[1][3][4][6]
History
A railroad first bridged the creek in this location in 1891.[2] In 1941, a wooden trestle bridge 858 feet (262 m) long was built in this location.[1][2][7] The nearby waves had already been surfed as early as 1937, and by 1951, local surfers had named the beach and its surf break "Trestles", after the bridge there.[8]
In 1992, the railway line containing the bridge was purchased by the North County Transportation District from the Atchison, Topeka and Santa Fe Railway.[3] Storms caused by the El Niño of 1998 damaged the bridge, leading a center section of the bridge 200 feet (61 m) long to be replaced by concrete and leaving separated wooden sections 100 feet (30 m) long in the south and 558 feet (170 m) long in the north.[2][7][9]
By 2007, inspectors determined that the northern segment of the bridge needed replacement.[2] Salt from the beach environment had rotted the wooden support beams, they had been damaged by fires set by beachgoers, the creosote protecting the beams had been worn away, and the bridge did not meet seismic standards.[2][3][6][7] Trains could not travel on the bridge at full speeds,[1][7] and frequent bridge maintenance was costing US$250,000 per year.[5][10] Construction began in 2010,[3][6][11] and a new concrete replacement for this bridge segment opened in 2012 at a cost of eight million dollars,[1][4] paid by federal funds from the American Recovery and Reinvestment Act of 2009.[7]
Design
In order to protect the 2012 bridge segment against corrosion, its rebar was protected by an epoxy coating and calcium nitrite was added as a corrosion inhibitor to its reinforced concrete.[12] The new concrete supports for the bridge structure are etched with letters spelling "Trestles", the nickname of the bridge.[1][4]
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ 3.0 3.1 3.2 3.3 3.4 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ 4.0 4.1 4.2 4.3 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ 6.0 6.1 6.2 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ 7.0 7.1 7.2 7.3 7.4 Lua error in package.lua at line 80: module 'strict' not found..
- ↑ Lua error in package.lua at line 80: module 'strict' not found..
- ↑ Lua error in package.lua at line 80: module 'strict' not found..
- ↑ Lua error in package.lua at line 80: module 'strict' not found..
- ↑ Lua error in package.lua at line 80: module 'strict' not found..
- ↑ Lua error in package.lua at line 80: module 'strict' not found.. See in particular example 4.2, San Mateo Creek Rail Bridge 207.6, pp. 195–196.
Lua error in package.lua at line 80: module 'strict' not found.