Changchun Bombardier Movia C951

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Bombardier Movia C951
Bombardier MOVIA C951.jpg
A C951 train.
Interior view in C951 train.jpg
Interior view in the front driving car in C951 train.
Bombardier MOVIA C951 interior.jpg
Interior view in the motor car in C951 train.
In service 22 December 2013–current
Manufacturer Changchun Bombardier Railway Vehicles
(Bombardier Transportation and CNR Changchun)[1]
Built at Changchun, China
Family name Movia
Constructed 2012 - 2016
Entered service 2013–
Number under construction 120 vehicles (40 sets)
Number built 276 vehicles (92 sets)
Number in service 135 vehicles (45 sets)
Formation 3 per trainset
Fleet numbers 9001 ~ 9092
Capacity 931 Passengers
Operator(s) SBS Transit DTL
(ComfortDelGro Corporation)
Depot(s) Changi, Gali Batu and Kim Chuan
Line(s) served Downtown Line
Specifications
Car body construction Welded aluminium
Train length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Car length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Width Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Height Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Doors Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value)., 8 per car
Maximum speed 90 km/h (56 mph) (Design)
80 km/h (50 mph) (Service)
Weight 38.3 t (37.7 long tons; 42.2 short tons) per car
Traction system IGBTVVVF
(Bombardier MITRAC 1000)
Traction motors 8 x (?) kW (Bombardier Mitrac PMSM)
Acceleration 1.1 m/s2 (3.6 ft/s2)
Deceleration 1.1 m/s2 (3.6 ft/s2) (Normal Braking)
1.4 m/s2 (4.6 ft/s2) (Emergency Braking)
Electric system(s) 750 V DC third rail
Current collection method Collector shoe
Braking system(s) Regenerative Braking, Resistor Braking, Air Brakes
Safety system(s) Siemens Trainguard Sirius CBTC ATC with subsystems of ATO GOA 4 (UTO), ATP, Controlguide Rail 9000 ATS, Trackguard Westrace MK2 CBI
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Bombardier Movia C951 is a type of train built by Changchun Bombardier Railway Vehicles (joint venture of Bombardier Transportation and CNR Changchun) for use on the Downtown Line, Singapore.[1][2][3] A total of 92 trainsets were ordered in three batches.[3]

History

73 trainsets consisting of three cars each were purchased at a cost of approximately S$570.7 million for passenger service.[4] Bombardier beat Alstom, Kawasaki Heavy Industries and Hyundai Rotem in the tendering process as the lowest cost offered.[5] Land Transport Authority later placed an additional order of 15 trainsets, and 4 more trainsets, bringing the total to 92 trainsets.[6] A partial number of the total fleet operates on the Stage 1 of Downtown Line since 22 December 2013.

Delivery

These trains are being delivered until 2016. They will be stabled at Changi Depot, Gali Batu Depot and also on Kim Chuan Depot.

On 12 October 2012, the first of 11 trains for the Downtown Line Stage 1 arrived at Jurong Port and transported to Kim Chuan Depot to undergo testing by LTA before it is handed over to SBS Transit.[7]

By 28 February 2013, Bombardier had delivered nine of the 11 trains for Downtown Line Stage 1.[6]:{{{3}}} LTA together with the operator, SBS Transit conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements are met before revenue service of the DTL1 which began on 22 December 2013.[8]

Features

Design

The C951 trains include several features that were not seen in existing trains.[9]

New features include:

  • an ergonomic seat profile;
  • red reserved seats, which allows for clearer separation between normal and reserved seats;
  • perch seats, replacing the two-seaters at the ends of the car;
  • hand grips utilising joints instead of straps, providing commuters a steadier grip;

The train will also retain existing features like having two rows of poles and hand grips, and vertical poles which split into three at the center.

Dynamic Route Map Display

The Dynamic Route Map Display (DRMD) is a rail travel information system, newly introduced and developed for the C951 trains. The dynamic route map display panels provide commuters with their journey status updates and route information. It also indicates which side the doors will open on. The Alstom Metropolis C830C and the Alstom Metropolis C751C feature the same DRMD.[10]

Platform Gap Width Reduction (PGWR)

The train doors have a frangible gap made of rubber that protrudes out. The platform-train gap will then be reduced from 75 to 40 mm, preventing passenger accidents due to the platform gap.[10]

Train Formation

The configuration of a C951 in revenue service is DM1-T-DM2

Cars of C951
car type Driver Cab Motor Collector Shoe car length Wheelchair Sapce
mm ft in
DM1 23,650 77 ft 7.1 in
DM2 23,650 77 ft 7.1 in
T 22,800 74 ft 9.6 in

The car numbers of the trains range from 9001x to 9092x, where x depends on the carriage type. Individual cars are assigned a five-digit serial number by the rail operator SBS Transit. A complete three-car trainset consists of one trailer (T) and two driving motor cars(DM1 & DM2) permanently coupled together. For example, set 903 aka 9003 consists of carriages 90031, 90032 and 90033.

  • The first digit is always a 9.
  • The second digit is always a 0
  • The third digit and fourth digit identifies the set number
  • The fifth digit is the car number.

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Bombardier Receives Contract from Land Transport Authority of Singapore for 219 Driverless Metro Cars Valued at Approximately 298 Million Euros
  5. Downtown train deal goes to Bombardier, Christopher Tan, The Straits Times, 8 November 2008
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Arrival Of Downtown Line Train Mock-Up
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.

See also

External links