Upfield railway line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Upfield railway line, Melbourne
Upfield line map
Line details
Commenced 1884
Completed 1889
Stations 14
Tracks Double track to Gowrie, single track beyond
Used by Metro Trains Melbourne
Service pattern Stops all stations; early morning weekend services skip Southern Cross. Weekday morning and weekend services run clockwise, while weekday afternoon services run anticlockwise, through the City Loop. Early morning weekend services run via (but not stopping at) Southern Cross to and from Flinders Street.
Rolling stock Comeng, Siemens
Former connections North East Line (Upfield-Somerton link)
Railways in Melbourne

The Upfield railway line is a suburban electric railway in the northern suburbs of Melbourne, Australia. The line has 15 stations and is located in Metlink ticketing Zones 1 and 2. The future of the Upfield line was in serious doubt in the late 1980s and early 1990s with proposals for the line to be converted into a light rail line or even closed. However, the future of the line was secured in 1995 with the upgrading of the signalling, closure or upgrade of the numerous level crossings, and duplication of the track between Fawkner and Gowrie.

Infrastructure

The line is double track as far as Gowrie Station, then it is single track to Upfield Station. Terminating facilities are provided at Coburg as well as Gowrie and Upfield. Stabling sidings are provided at Upfield. Power signalling is provided throughout the line, with Coburg and Gowrie being remotely controlled from Upfield. The line continues past Upfield to rejoin the North East line at Somerton, but this section is in poor condition as it is overgrown with vegetation and has not been used for some time. There are 5 Sidings on the Upfield-Somerton link that are not used but are in great condition.

History

File:Macaulay-Station-Melbourne.jpg
Macaulay station, under the CityLink freeway
Flemington Bridge station, with CityLink in the background

The line from North Melbourne to Coburg opened in September 1884, and in October 1889 it was extended to Somerton. Meanwhile, duplication had already started, being provided to Royal Park in September 1888, to South Brunswick (Jewell) in May 1889, Brunswick to Coburg in December 1891, and South Brunswick to Brunswick in August 1892.

Coburg to Somerton closed in July 1903, but reopened as far as Fawkner station in December 1906, for funeral trains only, in conjunction with the opening of Fawkner Cemetery adjacent to the station. Full services were extended to Fawkner in 1915.

In December 1920 the line was electrified, then in March 1928, the section from Fawkner to Somerton reopened with passenger services provided by an AEC railmotor connecting with electric trains at Fawkner.[1]

North Melbourne to Macaulay was converted to automatic signalling in June 1928, but the rest of the line remained as Double Line Block and Staff and Ticket until more recent times.

In May 1956, Fawkner to Somerton was again closed, but only three years later, Upfield to Somerton reopened (in July 1959) for goods trains,[1] and on the same date Coburg to Fawkner was duplicated. The following month, Fawkner to Upfield was reopened and electrified, to cater for workers to and from the new Ford factory next to the station. Only one train each way was provided, although a second train was added the following month. Shortly before this, however, (in September 1958), Sunday evening services after 6 p.m. were withdrawn, being replaced by rail tickets being accepted on adjacent tram routes, particularly the North Coburg line, and, for the outer end of the railway line, a bus service connecting with trams at North Coburg. In June 1971, this arrangement was extended to apply for the whole of Sundays, and in October 1981, it was further extended to include services after 7:30 p.m. on Mondays to Saturdays.

In January 1963 Somerton to the Ford factory at Upfield was converted to dual gauge, one year after the North East standard gauge line opened, and in October 1968 Upfield to Somerton was converted to Electric Staff working.[1]

Automatic signalling crept a little further along the line, with Royal Park to Jewell being converted in August 1971 and Macaulay to Royal Park in April 1972.

File:P980906Tinning st gates closure0002.JPG
Closure of Tinning Street Manual Gate for the last time on 6 Sept 1998

Proposals to convert the line to light rail (to replace the parallel tram line) or a freeway were finally put to rest in April 1995 when it was announced that $23 million would be spent upgrading the line. This work included the provision of power signalling for the rest of the line, and boomgates at all level crossings, except for a few crossings that would be closed instead. Many of the level crossings at this time were still under the control of gate keepers who opened and closed the gates manually for every train.

Automatic signalling extended from Jewell to Brunswick in September 1998, Moreland to Batman in October, and Batman to Upfield in November. This last section coincided with extension of duplication from Fawkner to Gowrie.

Services

The Upfield line has one of the least-frequent peak-period services in Melbourne's railway network, with trains operating every 18 minutes during the morning peak, and 20 minutes during the remainder of the day on weekdays (including peak periods) and weekends, and every 30 minutes during early morning, Sundays and throughout the later evening through to the last train. Until the late 1990s, when the line was under threat of closure or conversion to light rail, late evening and Sunday services were provided by nearby tram lines and a bus service that connected with the end of the nearby tram line.

In mid-2004, the majority of peak services were increased from 3-carriage to 6-carriage trains.

The line also has one of the lowest proportion of premium stations amongst Melbourne's railway lines, there being only three stations on the line (past the junction at North Melbourne) classified as Premium stations. These are Coburg, Gowrie and Upfield. Brunswick station was initially announced as one of the host stations throughout Melbourne's network, however up until November 2006 this has not occurred. During the 2006 Commonwealth Games the area around Royal Park station was home to various event venues as well as the athlete's village, and as such this station was heavily staffed during the Games.

Line guide

File:Fawkner-Melbourne-aerial.jpg
Aerial view of the Upfield line crossing the Western Ring Road in Fawkner

Bold stations are termini, where some train services terminate; italic stations are staffed.

Branches from the City Loop at Southern Cross and Flagstaff.

Upfield railway line
0.0 km Flinders Street (FSS) Zone 1
1.2 km Southern Cross (SSS) Zone 1
City Loop
2.9 km North Melbourne (NME) Zone 1
Craigieburn, Sunbury and Werribee lines
4.5 km Macaulay (MAC) Zone 1
5.3 km Flemington Bridge (FBD) Zone 1
6.7 km Royal Park (RPK) Zone 1
Inner Circle line
7.7 km Jewell (JWL) Zone 1
8.5 km Brunswick (BWK) Zone 1
9.3 km Anstey (ASY) Zone 1
10.0 km Moreland (MLD) Zone 1
11.4 km Coburg (COB) Zone 1
12.5 km Batman (BAT) Zones 1 & 2
13.7 km Merlynston (MYN) Zones 1 & 2
14.4 km Fawkner (FAK) Zones 1 & 2
16.0 km Gowrie (GOW) Zone 2
16.6 km Campbellfield (demolished)
20.1 km Upfield (UFD) Zone 2
Upfield-Somerton link (not in use)
North East (standard gauge) line
23.0 km Roxburgh Park (RXP) Zone 2
Aitkens Creek
27.0 km Craigieburn (CGB) Zone 2
North East line

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.

Further reading

  • Lua error in package.lua at line 80: module 'strict' not found.

External links