E993 series
E993 series | |
---|---|
300px
E993 series train on test, June 2004
|
|
In service | 2002–2006 |
Manufacturer | Kawasaki Heavy Industries, Tokyu Car Corporation |
Scrapped | 2006 |
Number built | 5 vehicles (1 set) |
Number scrapped | 5 vehicles (1 set) |
Formation | 5 cars per set |
Operator(s) | JR East |
Depot(s) | Kawagoe |
Specifications | |
Car body construction | Stainless steel/aluminium |
Car length | 16,050 mm (52 ft 8 in) (end cars), 13,000 mm (42 ft 8 in) (intermediate cars) |
Width | 3,000 mm (9 ft 10 in) |
Height | 3,640 mm (11 ft 11 in) |
Floor height | 1,150 mm (3 ft 9 in) |
Maximum speed | 120 km/h (75 mph) |
Power output | 200kW x2 per motor car |
Electric system(s) | 1,500 V DC |
Current collection method | Overhead catenary |
Safety system(s) | ATC, ATS-P, ATS-SN |
Track gauge | 1,067 mm (3 ft 6 in) |
The E993 series (E993系?) "AC Train" was an experimental 5-car electric multiple unit (EMU) train operated by East Japan Railway Company (JR East) in Japan between 2002 and 2006.[1][2]
Concept
The E993 series "AC Train" ("Advanced Commuter Train") was developed by JR East to test and evaluate a number of new technologies and features for possible use in future commuter train designs.[1] These included features intended to reduce life-cycle costs, improve the interior passenger environment, improve accessibility, and increase environmental friendliness.[2]
Technological features
The train incorporated the following features for evaluation.[2]
- Articulated cars with shared bogies
- Direct drive motors (DDM)
- Double-skin body construction
- Externally slung sliding doors
- Advanced Train Information Management System (AIMS)
Formation
The 5-car articulated set was based at Kawagoe Depot on the Kawagoe Line and formed as shown below, with car 1 at the Kawagoe end, and car 5 at the Shinjuku end.[3] Cars 1 and 2 were built by Kawasaki Heavy Industries in Kobe, and cars 3 to 5 were built by Tokyu Car Corporation in Yokohama.[2]
Car No. | 1 | 2 | 3 | 4 | 5 |
---|---|---|---|---|---|
Designation | Tc' | M' | M | T | Tc |
Numbering | KuHa E992-1 | MoHa E992-1 | MoHa E993-1 | SaHa E993-1 | KuHa E993-1 |
Cars 2 and 4 were each fitted with one single-arm pantograph.[3]
Cars 1 and 2 had double-skin aluminium bodies, cars 3 to 5 had stainless steel bodies with double-skin construction used for cars 3 and 5.[2]
-
L25 Tc992-1 1200.jpg
KuHa E992-1
-
L25 M992-1 1200.jpg
MoHa E992-1
-
L25 M993-1 1200.jpg
MoHa E993-1
-
L25 T993-1 1200.jpg
SaHa E993-1
-
L25 Tc993-1 1200.jpg
KuHa E993-1
History
The train was delivered to JR East's Kawagoe Depot on 17 January 2002.[2] Test running commenced on the Kawagoe Line and Saikyo Line the following month.[2]
The train was officially withdrawn on 14 July 2006.[4]
Features tested on the E993 series, including articulated cars and direct drive motors, were subsequently incorporated in the E331 series prototype train delivered in 2006.
References
Wikimedia Commons has media related to E993 series. |
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with broken file links
- Articles that mention track gauge 1067 mm
- Articles containing Japanese-language text
- Commons category link is locally defined
- East Japan Railway Company
- Use dmy dates from February 2012
- Electric multiple units of Japan
- 2002 introductions
- Articulated passenger trains
- Gearless electric drive
- Experimental vehicles