Northern and Eastern Railway

From Infogalactic: the planetary knowledge core
(Redirected from Northern & Eastern Railway)
Jump to: navigation, search
Northern and Eastern Railway
Locale North East London and Hertfordshire UK
Dates of operation 1840–1902
Successor Great Eastern Railway
Track gauge 4 ft 8 12 in (1,435 mm)
Previous gauge 5 ft (1,524 mm)

The Northern & Eastern Railway (N&ER) was the British railway company that built what is now the West Anglia Main Line, one of the two main lines of the Great Eastern Railway, the other being the Liverpool Street to Norwich line built by the Eastern Counties and Eastern Union Railways.[1] The N&ER and Eastern Counties Railway merged in 1844.

Proposals

The N&ER was part of an 1833 scheme for a railway from Islington to York via Cambridge, Peterborough and Lincoln. The original "Grand Northern Railway" project, proposed by Nicholas Wilcox Cundy, floundered until adopted by the Lincolnshire landowner Henry Handley. He formed the N&ER and, in 1835, had the route re-surveyed by engineer James Walker.

Construction

On 4 July 1836 an Act incorporated the N&ER and authorised construction between Islington in North London and Cambridge [2] with a share capital of £1,200,000.[3]

By 1837 difficulty in raising capital during the economic depression saw the decision to scale back the initial section of the railway to run between the Kingsland Turnpike (now Kingsland Road) near London and Broxbourne in Hertfordshire.[4] Late in that year the contract for construction was awarded to David Macintosh.[5]

In March 1838 construction started with Michael Borthwick as resident engineer. Although it was still hoped to build the railway as far as Islington, the directors approached the Commercial Railway (later London and Blackwall Railway) with the intention of running through to London Fenchurch Street station. These negotiations failed, but in August agreement was reached with the Eastern Counties Railway (ECR) to use their new Shoreditch terminus - the latter needed the additional income to finance its main line to Colchester.[6]

The N&ER agreed to build a line from Tottenham to the ECR main line at Stratford and share the ECR line into Shoreditch. The ECR agreed to build a separate terminus at Shoreditch for the N&ER.[5]

The ECR was 1,524 mm (5 ft) gauge [7] so the N&ER used that gauge rather than the emerging standard gauge 1,435 mm (4 ft 8 12 in). In early 1837 the N&ER abandoned plans for northward extension to Bishops Stortford and later in the year the Islington extension was formerly abandoned by Act of Parliament. By May the contractor was in difficulties and Robert Stephenson was appointed as Engineer in Chief, with Borthwick continuing as resident engineer. George Parker Bidder was appointed as the new contractor.

Engineering contractors Grissell and Peto were approached late in 1837 about building the line as far as Bishops Stortford. In March 1840 they started work between Stratford and Tottenham and finally took over the work between Tottenham and Broxbourne from David McIntosh.

The first section opens

On 15 September 1840 the line between Stratford and Broxbourne opened to passengers[2] as a single line, doubled in 1841. Trains ran through to Shoreditch although there was a disagreement between the ECR and N&ER over stopping at Stratford, with the former wanting a monopoly on Stratford to Shoreditch tickets.[8]

In October 1840 work started on the northern extension to Burnt Mill station by contractor Thorntons, followed in January 1841 by the award of a contract to build the railway from Burnt Mill to Bishops Stortford to Earl and Pearce.

In June 1841 parliamentary assent was given for a branch from Broxbourne to Hertford (the Hertford East Branch Line) and around this time Grissell and Peto take over construction of Broxbourne to Harlow section and started working on the section to Spelbroke (between Harlow and Bishops Stortford). In August the ECR began to construct the N&ER terminus at Shoreditch, but this has been abandoned by 1842 partly due to legal difficulties.

Initial Stations

The line to Bishops Stortford opens

On 16 May 1842 the line to Bishops Stortford opened [9] and N&ER trains were allowed to call at Stratford. The following year the two companies came to agreement over goods traffic and in July the ECR made an offer to lease the N&ER, which was rejected as N&ER shareholders felt they could get a better deal.[10]

Work on the Hertford branch line began early in 1843 and opened as a single track on 31 October, doubled in October 1846. 1843 also saw the operation of goods trains between Bishops Stortford and Shoreditch. Some (if not all) of these trains were worked by locomotives and rolling stock belonging to a contractor. They included third-class carriages for butchers and graziers travelling to Smithfield Market.[11] In September in conjunction with the Norfolk Railway surveying work began to extend from Bishops Stortford through Cambridge to Brandon in Norfolk as a main line from London to Norwich.

Merger with the Eastern Counties Railway

On 25 October 1843 an agreement facilitated by Bidder [12] was reached by the ECR and N&ER, and from 1 January 1844 the N&ER was leased to the ECR for 999 years, being formerly ratified by parliament in May. Two directors from the N&ER were appointed to the ECR board, which arrangement continued to 1862 when the ECR became part of the Great Eastern Railway (GER). The N&ER survived as a private company until merged into the GER in 1902.

Locomotives

The company purchased 14 2-2-2 locomotives from four builders:

The locomotives were re-gauged to standard gauge in September and October 1844.[14]

Carriages

Carriages were 20 feet long and 7 feet wide. They had six wheels and were first, second or third class with capacity for 24, 32 and 60-70 passengers respectively. They had footboards to allow passengers to board at locations with no or low platforms. The third class carriages were open to the elements.[4]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. William Templeton - The Locomotive Engine Popularly Explained - Page 96
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.