Boeing 787 Dreamliner battery problems

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

The heavily burned battery from JA829J after it suffered thermal runaway
The Aft Electronics Bay that held the battery that caught fire
The grounded Japan Airlines 787 at Boston Logan Airport

In the Boeing 787 Dreamliner's first year of service, at least four aircraft suffered from electrical system problems stemming from its lithium-ion batteries. Although teething problems are common within the first year of a new aircraft design's life, after a number of incidents including an electrical fire aboard an All Nippon Airways 787, and a similar fire found by maintenance workers on a landed Japan Airlines 787 at Boston's Logan International Airport, the United States Federal Aviation Administration (FAA) ordered a review into the design and manufacture of the Boeing 787 Dreamliner, following five incidents in five days involving the aircraft, mostly involved with problems with the batteries and electrical systems. This was followed with a full grounding of the entire Boeing 787 fleet, the first such grounding since that of the McDonnell Douglas DC-10 in 1979.[1] The plane has had two major battery thermal runaway events in 52,000 flight hours, which was substantially less than the 10 million flight hours predicted by Boeing, neither of which were contained in a safe manner.[2]

The National Transportation Safety Board released a report on December 1, 2014, and assigned blame to several groups:[3]

  • GS Yuasa of Japan, for battery manufacturing methods that could introduce defects not caught by inspection
  • Boeing’s engineers, who failed to consider and test for worst-case battery failures
  • The Federal Aviation Administration, who failed to recognize the potential hazard and did not require proper tests as part of its certification process

Timeline

In December 2012, Boeing CEO James McNerney told media outlets that the problems were no greater than those experienced by the company with the introduction of other new models, such as the Boeing 777.[4] However, on January 7, 2013, a battery overheated and started a fire in an empty 787 operated by Japan Airlines (JAL) at Boston's Logan International Airport.[5][6] On January 9, United Airlines reported a problem in one of its six 787s with the wiring located in the same area as where the battery fire occurred on JAL's airliner; subsequently, the U.S. National Transportation Safety Board opened a safety probe.[7]

On January 11, 2013, the FAA announced a comprehensive review of the 787's critical systems, including the design, manufacture and assembly of the aircraft. U.S. Department of Transportation secretary Ray LaHood stated the administration was "looking for the root causes" behind the recent issues. The head of the FAA, Michael Huerta, said that so far nothing found "suggests [the 787] is not safe".[8] Japan's transport ministry also launched an investigation in response.[9]

On January 16, 2013, an All Nippon Airways (ANA) 787 made an emergency landing at Takamatsu Airport on Shikoku Island after the flight crew received a computer warning of smoke present inside one of the electrical compartments.[10][11] ANA said that there was an error message in the cockpit citing a battery malfunction. Passengers and crew were evacuated using the emergency slides.[12] According to The Register, there are no fire-suppression systems in the electrical compartments holding batteries, only smoke detectors.[13]

US-based aviation regulators' oversight into the 2007 safety approval and FAA certification of the 787 has now come under scrutiny, as a key US Senate committee prepares for a hearing into the procedures of aviation safety certification "in coming weeks". However, an FAA spokesperson defended their 2007 safety certification of the 787 by saying, "the whole aviation system is designed so that if the worst case happens, there are systems in place to prevent that from interfering with other systems on the plane".[14]

On February 12, 2013 the Wall Street Journal reported that "Aviation safety investigators are examining whether the formation of microscopic structures known as dendrites inside the Boeing Co. 787's lithium-ion batteries played a role in twin incidents that prompted the fleet to be grounded nearly a month ago."[15]

On January 14, 2014, Japan Airlines said a maintenance crew at Narita Airport discovered smoke coming from the main battery of one of its Boeing 787 jets, two hours before the plane was due to fly to Bangkok from Tokyo. Maintenance workers found smoke and unidentified liquid coming from the main battery, and alarms in the cockpit indicated faults with the power pack and its charger. The airline said no other equipment was affected by the incident. The cause was not immediately known, and the airline is investigating the incident.[16]

In January 2014, a battery in a Japanese Airlines 787 emitted smoke from the battery's protection exhaust and partially melted while the aircraft was undergoing pre-flight maintenance. The cause of this latest incident remains under investigation.[17][18][19] Soon after this incident, the Guardian noted that 'The agency [US Federal Aviation Administration] also launched a review of the design, manufacture and assembly of the 787 in January last year and said its report would be released last summer, but it has so far not released the report and has not responded to questions about when it will be finished.'[20]

Groundings

On January 16, 2013, both major Japanese airlines ANA and JAL announced that they were voluntarily grounding or suspending flights for their fleets of 787s after multiple incidents involving different 787s, including emergency landings. These two carriers operate 24 of the 50 Dreamliners delivered to date.[21][22] The grounding could cost ANA over $1.1 million a day.[23]

On January 16, 2013, the FAA issued an emergency airworthiness directive ordering all U.S.-based airlines to ground their Boeing 787s until yet-to-be-determined modifications are made to the electrical system to reduce the risk of the battery overheating or catching fire.[24] This is the first time that the FAA has grounded an airliner type since 1979.[1] The FAA also announced plans to conduct an extensive review of the 787's critical systems. The focus of the review will be on the safety of the lithium-ion batteries[1] which use lithium cobalt oxide(LiCoO2) as the positive electrode. These electrodes are known for their thermal runaway hazard and provide oxygen for a fire. The 787 battery contract was signed in 2005,[25] when LiCoO2 batteries were the only type of lithium aerospace battery available, but since then newer and safer[26] types (such as LiFePO4) and LiMn2O4 (Lithium Manganate), which provide less reaction energy during thermal runaway, have become available.[27][28] The FAA approved a 787 battery in 2007 with nine "special conditions".[29][30] A battery approved by FAA (through Mobile Power Solutions) was made by Rose Electronics using Kokam cells,[31] but the batteries installed in the 787 are made by Yuasa.[32]

Three All Nippon Airways 787 aircraft grounded at Tokyo on January 27, 2013

On January 20, the NTSB declared that overvoltage was not the cause of the Boston incident, as voltage did not exceed the battery limit of 32 V,[33] and the charging unit passed tests. The battery had signs of short circuiting and thermal runaway.[34] Despite this, on January 24 the NTSB announced that it had not yet pinpointed the cause of the Boston fire; the FAA will not allow U.S.-based Dreamliners to fly again until the problem is found and corrected. In a press briefing that day, NTSB Chairwoman Deborah Hersman said that the NTSB had found evidence of failure of multiple safety systems designed to prevent these battery problems, and stated that fire must never happen on an airplane.[35] The Japan Transport Safety Board (JTSB) has said on January 23 that the battery in ANA jets in Japan reached a maximum voltage of 31 V (lower than the 32 V limit like the Boston JAL 787), but had a sudden unexplained voltage drop[36] to near zero.[37] All cells had signs of thermal damage before thermal runaway.[38] ANA and JAL had replaced several 787 batteries before the mishaps.[37] As of January 29, 2013, JTSB approved the Yuasa factory quality control[39][40][41] while the American NTSB continues to look for defects in the Boston battery.[42]

Industry experts disagree on consequences of the grounding: Airbus is confident that Boeing will resolve the issue[43] and that no airlines will switch plane type,[44] while other experts see the problem as "costly"[45] and "could take upwards of a year".[46]

The only U.S.-based airlines that operate the Dreamliner are United Airlines and American Airlines.[47] Chile's Directorate General of Civil Aviation (DGAC) grounded LAN Airlines' three 787s.[48] The Indian Directorate General of Civil Aviation (DGCA) directed Air India to ground its six Dreamliners. The Japanese Transport Ministry made the ANA and JAL groundings official and indefinite following the FAA announcement.[49] The European Aviation Safety Agency has also followed the FAA's advice and grounded the only two European 787s operated by LOT Polish Airlines.[50] Qatar Airways has announced that they are grounding their five Dreamliners.[51] Ethiopian Air was the final operator to announce temporary groundings of its four Dreamliners.[52]

As of January 17, 2013, all 50 of the aircraft were grounded.[52][53][54] On January 18, Boeing announced that it was halting 787 deliveries until the battery problem was resolved.[55] On February 4, 2013, the FAA permitted Boeing to conduct test flights of 787 aircraft to gather additional data.[56]

Solution

The Federal Aviation Administration decided on April 19, 2013 to allow US Dreamliners to return to service after changes were made to their battery systems to better contain battery fires.[57] Japanese authorities announced they were doing the same for their airplanes. The causes of the battery failures are still unknown. There is still concern that because the root cause of the fires were not identified, the solutions put in place by Boeing will not be able to cover the full range of possible failure modes. These include problems that may arise from poor systems integration between the engine indicating and crew alerting system (EICAS) and the battery management system [58]

In December 2014 the NTSB criticized the FAA, Boeing and the battery manufacturer for the faults,[59][60][61][62][63][64] as well as the performance of the flight data recorder.[65] The Japan Civil Aviation Bureau wants Boeing to redesign the battery.[66]

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. {url=http://www.theregister.co.uk/2014/01/16/us_safety_authorities_on_boeings_case_787_batteries_fail/}
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found.
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. Lua error in package.lua at line 80: module 'strict' not found.
  37. 37.0 37.1 Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. "JTSB report JA804A" (Archive). Japan Transport Safety Board - See Japanese version (Archive) (The Japanese version is the version of record, and it prevails in case of any differences between it and the English version) and "航空重大インシデント調査報告書説明資料" (Archive).
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. "Airbus CEO `Confident' Boeing Will Find Fix for 787" Bloomberg, January 17, 2013.
  44. Lua error in package.lua at line 80: module 'strict' not found.
  45. "`Big Cost' Seen for Boeing Dreamliner Grounding" Bloomberg, January 17, 2013.
  46. White, Martha C. "Is the Dreamliner Becoming a Financial Nightmare for Boeing?" TIME magazine, January 17, 2013.
  47. Lua error in package.lua at line 80: module 'strict' not found.
  48. Lua error in package.lua at line 80: module 'strict' not found.
  49. Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.
  51. Lua error in package.lua at line 80: module 'strict' not found.
  52. 52.0 52.1 Lua error in package.lua at line 80: module 'strict' not found.
  53. Lua error in package.lua at line 80: module 'strict' not found.
  54. Boeing 787 Dreamliner: The impact of safety concerns. BBC News. January 17, 2013. Retrieved January 17, 2013.
  55. Lua error in package.lua at line 80: module 'strict' not found.
  56. Lua error in package.lua at line 80: module 'strict' not found.
  57. Lua error in package.lua at line 80: module 'strict' not found.
  58. Williard, He, Hendricks, Pecht, "Lessons Learned from the 787 Dreamliner Issue on Lithium-Ion Battery Reliability" Energies 2013, 6, 4682-4695; doi:10.3390/en6094682
  59. Knudson, Peter. "NTSB Recommends Process Improvements for Certifying Lithium-ion Batteries as it Concludes its Investigation of the 787 Boston Battery Fire Incident" NTSB, 1 December 2014.
  60. Lua error in package.lua at line 80: module 'strict' not found.
  61. Lua error in package.lua at line 80: module 'strict' not found.
  62. Lua error in package.lua at line 80: module 'strict' not found.
  63. Gallagher, Sean. "NTSB blames bad battery design—and bad management—in Boeing 787 fires" Ars Technica, 2 December 2014.
  64. Croft, John. "NTSB 787 Battery Recommendations Focus On Processes, Quality, Oversight" Aviation Week & Space Technology, 2 December 2014. Accessed: 3 December 2014. Archived on 3 December 2014
  65. Lua error in package.lua at line 80: module 'strict' not found.
  66. Lua error in package.lua at line 80: module 'strict' not found.