Cefn Croes Wind Farm
From Infogalactic: the planetary knowledge core
Cefn Croes Wind Farm | |
---|---|
File:Cefncroeswindfarm1.JPG
The wind farm near its completion
|
|
Location of Cefn Croes Wind Farm in Wales
|
|
Country | Wales, United Kingdom |
Location | near Devil's Bridge, Ceredigion |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | June 2005 |
Owner(s) | Falck Renewables |
Wind farm | |
Type | Onshore |
Site area | 7.5 km2 (2.9 sq mi) |
Power generation | |
Units operational | 39 x 1.5 MW |
Make and model | General Electric |
Nameplate capacity | 58.5 MW |
Cefn Croes is a wind farm in Ceredigion, Wales. It is located in the Cambrian Mountains on Cefn Croes mountain, 573m (1,880 ft) south of the A44 road between Aberystwyth and Llangurig, in west Wales. The construction of the wind farm commenced in February 2004, and was completed in the spring of 2005 when the 39 wind turbines started producing electricity. The maximum installed nameplate capacity is 58.5 MW.[1]
References
Wikimedia Commons has media related to Cefn Croes Wind Farm. |
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>